FIELD: construction.
SUBSTANCE: invention concerns construction, particularly methods of bored pile construction on any ground, and can be applied in industrial and civil construction for construction of new basements and reinforcement of existing basements, and in construction of supports bearing alternating loads. Device for bored pile construction includes hollow auger column with metal case inside the column, and vane auger bit. Spring plate elements are rigidly mounted at peripheral part of metal case in horizontal plane in pairs opposing each other and distributed in height, so that each next pair of spring plate elements is perpendicular to the previous pair, and vane auger bit features one vane declining from the pile axis and connected by joint to the bit case to maintain free movement of metal case to borehole. In addition, arch length of spring plate element is larger than possible borehole diametre in any section.
EFFECT: extended device application sphere in pile construction, enhanced carrying capacity and quality of pile.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR BORED PILES CONSTRUCTION | 2007 |
|
RU2333315C1 |
DEVICE FOR PERFORMANCE OF STATIC PROBING OF SOILS WITH VARIABLE DENSITY | 2008 |
|
RU2378452C1 |
METHOD FOR BORED PILE ERECTION | 2007 |
|
RU2319808C1 |
METHOD FOR BORED PILE ERECTION IN GROUND | 2007 |
|
RU2317373C1 |
METHOD OF BORED PILE CONSTRUCTION AND DEVICE FOR METHOD IMPLEMENTATION | 2007 |
|
RU2354781C2 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2303102C1 |
DEVICE FOR ERECTION OF DRILLED PILE | 2009 |
|
RU2398932C1 |
BORED AUGER PILE INSTALLATION DEVICE | 2007 |
|
RU2328575C1 |
Authors
Dates
2009-09-20—Published
2008-09-29—Filed