FIELD: construction.
SUBSTANCE: invention concerns bored pile construction in any soil environment, and can be applied in industrial and civil construction for construction of new foundations and reinforcement of existing ones, as well as in construction of supports bearing alternate loads. Method involves well drilling by drilling assembly consisting of drilling column and rock crusher, filling the well with solidifying mix, drilling column extraction from well, downtake of metal frame. Well drilling is performed with crushed rock discharge to surface by flush liquid or compressed air fed to bottomhole through hollow drilling column. Simultaneously with well drilling, metal frame made of reinforcement rods with helical flange at external surface is taken down by rotation. Frame is mounted coaxially along drilling column and can rotate together with it. Drilling column is extracted from well together with rock crusher, along with uninterrupted filling of well with solidifying mix through hollow drilling column.
EFFECT: enhanced efficiency of bored pile construction, improved manufacturing quality, enhanced life time and strength of pile.
4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR ERECTION OF DRILLED PILE | 2009 |
|
RU2398932C1 |
METHOD FOR BORED PILE ERECTION IN GROUND | 2007 |
|
RU2317373C1 |
METHOD FOR BORED PILE ERECTION | 2007 |
|
RU2319808C1 |
DEVICE FOR BORED PILE CONSTRUCTION | 2008 |
|
RU2367741C1 |
SYSTEM FOR BORED PILES CONSTRUCTION | 2007 |
|
RU2333315C1 |
BORED AUGER PILE INSTALLATION DEVICE | 2007 |
|
RU2328575C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
DEVICE FOR ERECTION OF BORED SCREW PILES | 2008 |
|
RU2439247C2 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
Authors
Dates
2009-05-10—Published
2007-07-12—Filed