FIELD: construction, particularly to erect industrial and civil buildings and to reconstruct existent foundation, as well as to construct supports taking alternating loads in grounds of any type.
SUBSTANCE: method involves creating pilot pile in well by well drilling along with cut ground carrying to ground surface with the use of auger drilling assembly provided with rock-cutting tool to be removed from well and device with extendible rock-compacting member, which creates annular cavities in pilot well wall in load-bearing ground layers in accordance with geological section; connecting said sections with each other through vertical cavities arranged in planes transversal to pile axis, wherein the vertical cavities are arranged in staggered order in planes parallel to pile axis.
EFFECT: increased load-bearing ability of the pile in any ground surroundings and in confined space.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BORED PILE ERECTION IN GROUND | 2007 |
|
RU2317373C1 |
BORED AUGER PILE INSTALLATION DEVICE | 2007 |
|
RU2328575C1 |
DEVICE FOR ERECTION OF BORED SCREW PILES | 2008 |
|
RU2439247C2 |
SYSTEM FOR BORED PILES CONSTRUCTION | 2007 |
|
RU2333315C1 |
DEVICE FOR BORED PILE CONSTRUCTION | 2008 |
|
RU2367741C1 |
DEVICE FOR PERFORMANCE OF STATIC PROBING OF SOILS WITH VARIABLE DENSITY | 2008 |
|
RU2378452C1 |
METHOD OF BORED PILE CONSTRUCTION AND DEVICE FOR METHOD IMPLEMENTATION | 2007 |
|
RU2354781C2 |
DEVICE FOR ERECTION OF DRILLED PILE | 2009 |
|
RU2398932C1 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
DEVICE FOR TRENCHLESS PIPELINE LAYING IN WEAKLY STABLE GROUND OR GROUND LIABLE TO HEAVING | 2006 |
|
RU2292426C1 |
Authors
Dates
2008-03-20—Published
2007-05-16—Filed