FIELD: oil and gas production industry, particularly well cementing for casing pipe leakage interval isolation.
SUBSTANCE: method involves supplying polyurethane pre-polymer having 2-10% isocyanate group content with the use of downhole technological assembly, which provides pre-polymer injection without primary property change; performing technological time-delay for pre-polymer foaming and hardening. Inner catalyst taken in amount of 3-3.5% by volume is added to polyurethane pre-polymer. The catalyst is glycerin or glycerin, which contains potash in amount of 1.0% by weight.
EFFECT: increased technological efficiency.
1 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WATER INFLUX ISOLATION AND RESTRICTION IN WELL | 2004 |
|
RU2272905C1 |
METHOD OF INSULATION AND RESTRICTION OF WATER PRODUCTION IN WELLS | 2008 |
|
RU2370630C1 |
METHOD FOR EXPRESS-REPAIRS TO RESTORE PRESSURIZATION OF GAS-WATER-OIL SHOWING WELLS | 2005 |
|
RU2287663C2 |
METHOD FOR PERFORMING MAINTENANCE AND ISOLATION OPERATIONS IN A WELL | 2003 |
|
RU2231625C1 |
WELL REPAIR COMPOUND FOR OIL AND GAS WELLS | 2014 |
|
RU2558558C1 |
METHOD FOR PRODUCTION WELL REPAIR | 2005 |
|
RU2322569C2 |
METHOD OF BINDING BOTTOMHOLE ZONE OF FORMATION | 2007 |
|
RU2352764C2 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF ELIMINATING LEAKAGE OF CASED COLUMN | 2007 |
|
RU2366801C2 |
Authors
Dates
2008-02-20—Published
2006-07-10—Filed