FIELD: oil extractive industry.
SUBSTANCE: method includes pumping of polyurethane prepolymer with amount of isocyanates groups 2-30%, mixed with diesel fuel with amount of diesel fuel 20-30%. Then anhydrous liquid and water solution with thickening agent is pumped again. All this technological liquids are supplied two treated range and supplied into treated area with productiveness 2.5-3.5 liters per second. Technological time lag is performed for at least 10 minutes. After that, well washing by reciprocal washing with counter-pressure equal to pressure at the start of washing process. Washing volume is set no less than volume of tubing column. After pumping of 2/3 of volume of washing fluid, counter-pressure is gradually decreased down to atmospheric. Well is then sealed and technological lag of no less then 48 hours is performed.
EFFECT: higher productiveness of method.
2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CASING PIPE LEAKAGE INTERVAL ISOLATION INSIDE WELL | 2006 |
|
RU2317399C1 |
METHOD FOR PRODUCTION WELL REPAIR | 2005 |
|
RU2322569C2 |
METHOD FOR WATER INFLUX ISOLATION AND RESTRICTION IN WELL | 2004 |
|
RU2272905C1 |
METHOD FOR BOTTOM WATER ISOLATION IN PRODUCING WELL | 2005 |
|
RU2263777C1 |
METHOD OF SHUT-OFF AND RESTRAINT OF WATER PRODUCTION IN WELLS | 2007 |
|
RU2349731C2 |
INSULATION COMPOSITION AND METHOD OF WELL TUBING-CASING ANNULUS PLUGGING | 2004 |
|
RU2277626C1 |
ISOLATION METHOD OF WATER INFLUX TO WELL | 2010 |
|
RU2425957C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD OF REINFORCING BOTTOMHOLE FORMATION AND ISOLATION OF BRINE WATER INFLUX IN OIL AND GAS WELLS | 2014 |
|
RU2587670C2 |
Authors
Dates
2004-06-27—Published
2003-10-02—Filed