FIELD: road construction, particularly for ground preparation for further ground road bed forming, particularly to reduce humidity, in-situ road base and ground thawing and for fresh concrete hardening.
SUBSTANCE: method for ground road bed dehumidification involves uniformly removing moisture from ground by-passing water conversion from one state into another without water evaporation; decreasing process duration due to increased intensity of continuous moisture reduction. Ground is simultaneously subjected to continuous air flow from air side without ground excavation, to electromagnetic field with ultrahigh frequency to be provided with the use of waveguide path via antennas and to acoustic field having sound intensity of not less than 145 dB. The antennas are of slotted-guide type.
EFFECT: reduced specific power inputs for ground road base dehumidification and decreased time.
1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ROAD BED CONSTRUCTION | 2002 |
|
RU2215844C1 |
MOTOR ROAD AT PERMAFROST GROUNDS | 2019 |
|
RU2732774C1 |
METHOD OF TIMBER DRYING | 2006 |
|
RU2330224C2 |
METHOD FOR ERECTION OF ROAD PAVEMENT | 2007 |
|
RU2351702C1 |
PROCESS LOGGING ROAD | 2019 |
|
RU2726709C1 |
MICROWAVE CONVEYER DRIER OF DIELECTRIC MATERIALS | 2001 |
|
RU2211416C1 |
METHOD FOR PRODUCTION OF EXPANDED TOBACCO | 2008 |
|
RU2390284C1 |
CORDUROYING MATERIAL FOR CONSTRUCTION OF ROADS | 2018 |
|
RU2735404C2 |
METHOD FOR AUTOMATIC REMOTE MONITORING OF ACCUMULATION OF RESIDUAL DEFORMATIONS AND VIBRATIONS OF HEAT AND MOISTURE CONDITIONS OF ELEMENTS OF ROAD STRUCTURES IN REAL OPERATING CONDITIONS | 2019 |
|
RU2710901C1 |
EARTH ROAD BED ON PERMAFROST BASE | 1999 |
|
RU2160336C2 |
Authors
Dates
2008-02-27—Published
2006-03-20—Filed