FIELD: construction of clearing roads from ground blocks in winter period on grounds with low bearing capacities. SUBSTANCE: method includes preparation of ground blocks in special reserve areas, moving of said ground blocks to site and formation of road bed. Novelty consists in that made in summer period are cutting of vertical seams in side reserves, isolation of cut area from atmospheric precipitation by covering with nonwoven synthetic material; in winter period, covering material is removed and freezing of blocks to preset depth is controlled, with subsequent break-off of blocks along frozen-thawed line and laying of frozen ground blocks having natural density with their bases upward, then, in summer, after thawing, road bed is compacted. EFFECT: reduced power intensity of road construction process with preserved road quality parameters. 2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
ROADBED BUILDING METHOD | 2001 |
|
RU2198255C2 |
ROADBED BUILDING METHOD | 2000 |
|
RU2198254C2 |
METHOD OF CONSTRUCTING AN EARTH TRACK | 0 |
|
SU1189942A1 |
AUTOMOBILE ROAD | 0 |
|
SU1770511A1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
ROAD EMBANKMENT ON PERMAFROST IN AREAS WITH SNOW TRANPORT | 2020 |
|
RU2756148C1 |
ROAD EMBANKMENT OVER PERMANENTLY FROSEN SOILS | 2006 |
|
RU2324032C1 |
ROAD STRUCTURE | 2006 |
|
RU2312181C1 |
METHOD FOR CONSTRUCTING SUBGRADE OF ADDITIONAL TRACK ON WEAK BASE IN CASE OF THAWING | 2021 |
|
RU2795020C1 |
Authors
Dates
2003-11-10—Published
2002-04-19—Filed