WELL TREATMENT METHOD AND SYSTEM Russian patent published in 2008 - IPC E21B43/25 E21B33/10 

Abstract RU 2320864 C2

FIELD: well treatment devices, particularly to stimulate oil production from wells.

SUBSTANCE: method involves creating the first and the second flows moving from well head to reservoir; injecting plugging fluid including plugging material suspended in carrier liquid so that the flow is in contact with well wall inside underground reservoir; separating carrier liquid from plugging material by liquid carrier supply through orifice row extending along the second flow path, wherein the orifices have dimensions, which permit carrier liquid passage and restrain plugging material as it touches the orifices; continuing plugging fluid up to necessary plugging material accumulation to create solid bridge; introducing reservoir treating fluid after solid bridge creation along the first fluid flow path and in contact with reservoir surface in well adjoining accumulated plugging material, which creates solid partition.

EFFECT: increased well treatment efficiency.

25 cl, 11 dwg

Similar patents RU2320864C2

Title Year Author Number
METHOD FOR FORMATION OF PACKINGS IN MULTIPLE PERFORATION CHANNELS IN CASING STRING OF WELL BORE 2006
  • Ist Lojd Eh. Ml.
RU2405920C2
METHOD FOR GRAVEL PACKING OF OPENHOLE WELLS 2019
  • Parlar, Mehmet
  • Gadiyar, Balkrishna
  • Debard, Julien
RU2773609C1
COMPATIBLE WITH CABLE AND CONTROLLED BY A NON-LIFT METHOD, CONFIGURED TO INTERACT WITH ANNULAR SPACE SYSTEM FOR USE AND ELIMINATION OF UNDERGROUND WELL 2012
  • Tandzhet Bryus E.
RU2689933C2
IMPROVED METHODS FOR DISTRIBUTION AND DEVIATION OF FLUIDS IN UNDERGROUND STRATA 2010
  • Glasbergen Gerard
  • Uehlton Tomas D.
  • Gualt'Eri Danial
RU2527988C2
METHODS OF MINIMIZING EXCESSIVE EXTENSION OF PROPPING AGENT UNDER HYDRAULIC FRACTURING TREATMENT 2014
  • Leserf Bryuno
  • Kremer Ched
  • Poup Timoti L.
  • Villberg Din M.
  • Usova Zinaida
RU2666566C2
UNDERGROUND WORK METHODS AND SYSTEMS WITH DOUBLE DRILLING STRING PIPES APPLICATION 2012
  • Strakhan Majkl Dzhon Makleod
RU2615541C2
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
HYDRAULIC FRACTURING METHOD OF UNDERGROUND FORMATIONS DURING THEIR DRILLING 2008
  • Dzhonson Ehshli
  • Dzheffrajs Bendzhamin P.
  • Braun Dzh. Ehrnest
RU2502866C2
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1

RU 2 320 864 C2

Authors

Dzhouns Llojd Dzh.

Dates

2008-03-27Published

2003-11-13Filed