IMPROVED METHODS FOR DISTRIBUTION AND DEVIATION OF FLUIDS IN UNDERGROUND STRATA Russian patent published in 2014 - IPC E21B33/138 E21B43/26 

Abstract RU 2527988 C2

FIELD: oil and gas industry.

SUBSTANCE: group of inventions is related to the methods which can be used in treatment of underground strata and, more specifically to the improved methods for distribution and deviation of fluids in underground strata. The method includes introduction of the first lost circulation material to an underground stratum through which the wellbore passes in order to reduce or prevent fluid flow to the first part of the underground stratum. Reduction or prevention is made by the first lost circulation material to the first part of the underground stratum. A part of the first fluid is introduced to the second part of the underground stratum having a higher fluid resistance than the first part of the underground stratum. The second lost circulation material is introduced to the underground stratum through which the wellbore passes in order to reduce or prevent fluid flow to the second part of the underground stratum. A part of the second fluid is introduced to the first part of the underground stratum with the first flow rate. The first lost circulation material is removed from the underground stratum. By means of temperature monitoring in the respective part of the underground stratum the time is determined when the first lost circulation material was removed, at least partially, from the underground stratum. The second fluid is introduced into the first part of the underground stratum.

EFFECT: increasing isolation efficiency.

12 cl, 8 dwg

Similar patents RU2527988C2

Title Year Author Number
METHODS OF MINIMIZING EXCESSIVE EXTENSION OF PROPPING AGENT UNDER HYDRAULIC FRACTURING TREATMENT 2014
  • Leserf Bryuno
  • Kremer Ched
  • Poup Timoti L.
  • Villberg Din M.
  • Usova Zinaida
RU2666566C2
DEFLECTING FLUID 2006
  • Sinkler A. Richard
  • Akbar Sied
  • Oukell Patrik R.
RU2433157C2
WELL TREATMENT METHOD AND SYSTEM 2003
  • Dzhouns Llojd Dzh.
RU2320864C2
FORMATION HYDRAULIC FRACTURING MONITORING 2010
  • Khill Devid Dzhon
  • Makyuen-King Magnus
  • Tindell Patrik
RU2648743C2
DOWNHOLE SAMPLER AND METHOD OF WELL SAMPLING 2004
  • Fildz Troj
RU2348807C2
COMPATIBLE WITH CABLE AND CONTROLLED BY A NON-LIFT METHOD, CONFIGURED TO INTERACT WITH ANNULAR SPACE SYSTEM FOR USE AND ELIMINATION OF UNDERGROUND WELL 2012
  • Tandzhet Bryus E.
RU2689933C2
MONITORING OF HYDROFRAC 2010
  • Khill Dehvid Dzhon
  • Mak'Juehn-King Magnus
  • Tindell Patrik
RU2537419C2
SYSTEMS AND METHODS OF AUXILLIARY PERFORATION SEALING IN THE BOREHOLE CASING STRING 2013
  • Tolman Rendi K.
  • Ankheles-Bosa Renso M.
  • Nyugor Kris Dzh.
  • Majer Kristian S.
  • Entchev Pavlin B.
RU2627327C2
METHOD FOR FORMATION OF PACKINGS IN MULTIPLE PERFORATION CHANNELS IN CASING STRING OF WELL BORE 2006
  • Ist Lojd Eh. Ml.
RU2405920C2
METHODS OF CONTROLLING OPERATION OF PERFORATORS SYSTEM IN BOREHOLE, UNDERGROUND BED FISSURING AND PROCESSING 2009
  • Makleod Trevor
  • Makhdi Abbas
RU2467160C2

RU 2 527 988 C2

Authors

Glasbergen Gerard

Uehlton Tomas D.

Gualt'Eri Danial

Dates

2014-09-10Published

2010-08-27Filed