FIELD: construction methods for rigid foundations, namely pile foundations, erection.
SUBSTANCE: method involves arranging piles and connecting the piles with mat. Holes are previously drilled in ground. The holes are provided with horizontal cavities by means of jet geotechnological operation. Then the holes are filled with fibrous concrete based on basalt fiber. Drilled holes are filled with concrete and reinforcing cage is inserted therein.
EFFECT: decreased building material consumption, increased rigidity of pile-and-mat foundation.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
SOIL-CONCRETE REINFORCED PILE AND METHOD OF ITS PRODUCTION | 2011 |
|
RU2467126C1 |
METHOD FOR PRODUCTION OF BORE PILE | 2015 |
|
RU2596170C1 |
FOUNDATION | 2006 |
|
RU2320820C1 |
METHOD FOR PILE-AND-SLAB FOUNDATION CONSTRUCTION IN SEISMIC AREAS | 2005 |
|
RU2300604C1 |
FOUNDATION OF PILES AND SLABS | 2007 |
|
RU2331738C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
PILE-PLATE FOUNDATION | 2016 |
|
RU2649352C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2009 |
|
RU2390609C1 |
METHOD OF BUILDING FOUNDATION FOR RESERVOIR | 2002 |
|
RU2209884C1 |
Authors
Dates
2008-04-10—Published
2006-07-24—Filed