FIELD: construction.
SUBSTANCE: method for erection of slab-pile foundation includes arrangement of pile field and foundation slab with conical hollow holes arranged in it. In process of building erection access is provided to conical holes of slab-foundation grill, and as time elapses when slab-foundation grill achieves rated settling, which equals 1/2 of permissible value for this type of buildings, all conical holes are filled with concrete.
EFFECT: increased bearing capacity of foundation, reduced settling.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT PILED RAFTS IN SEISMIC AREAS | 2012 |
|
RU2513050C1 |
METHOD FOR PILE-AND-SLAB FOUNDATION CONSTRUCTION IN SEISMIC AREAS | 2005 |
|
RU2300604C1 |
METHOD OF ERECTING FOUNDATION | 2016 |
|
RU2626479C1 |
SINGLE-PILE-SLABBY FOUNDATION | 2016 |
|
RU2638664C2 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD | 2015 |
|
RU2667163C2 |
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION | 2016 |
|
RU2633619C1 |
FOUNDATION OF PILES AND SLABS | 2007 |
|
RU2331738C1 |
CONSTRUCTION METHOD OF PILE-SLAB FOUNDATION OF HIGH-RISE BUILDING | 2013 |
|
RU2549632C1 |
Authors
Dates
2010-01-10—Published
2008-08-14—Filed