FIELD: oil production, particularly methods to isolate troublesome zones during well drilling and well repair with the use of shutters made of profiled casing pipes.
SUBSTANCE: method involves connecting profiled pipe sections with end cylindrical sections; lowering shutter to selected closing interval; preliminarily straightening shutter with excessive pressure in upper section; straightening remainder sections with wedge die and tightly pressing thereof to well wall.
EFFECT: increased shutter installation quality and reliability.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROFILE SHUTTER INSTALLATION IN WELL | 2007 |
|
RU2339786C1 |
METHOD OF INSTALLING SECTION-SHAPED OVERLAPPING DEVICE IN WELL | 2007 |
|
RU2346139C1 |
INSTALLATION METHOD OF PROFILE CAPPING IN HOLE | 2006 |
|
RU2325505C1 |
METHOD FOR PROFILED SHUTTER INSTALLATION IN WELL | 2006 |
|
RU2307916C1 |
WELL PROFILE SHUTTER INSTALLATION METHOD | 2008 |
|
RU2379464C1 |
INSTALLATION METHOD OF PROFILE OVERLAPPING DEVICE IN WELL | 2009 |
|
RU2386781C1 |
METHOD FOR SEPARATION OF HORIZONTAL WELL INTO SEPARATE SECTIONS | 2015 |
|
RU2611791C1 |
METHOD OF SETTING A PROFILED CLOSURE IN WELL | 0 |
|
SU907220A1 |
METHOD OF CONNECTING SHAPED PROFILER TUBES | 2018 |
|
RU2692581C1 |
METHOD OF REINFORCEMENT OF WELL TROUBLESOME ZONE USING SHAPED SHUTTER | 2014 |
|
RU2548269C1 |
Authors
Dates
2008-04-10—Published
2006-11-13—Filed