FIELD: oil and gas industry.
SUBSTANCE: invention refers to methods of isolation of problem zones with well boring, and also with wells repairing by shutters from profile casing pipes. At method realisation sections of profile pipes are jointed to final cylindrical sections, shutter is dropped in the necessary spacing of capping, and it is corrected by preliminary overpressure in the top section, shutter sections are densely held down to hole walls. Quality and reliability of installation are improved, expenses are relieved.
EFFECT: quality and reliability improvement of profile capping installation in the hole; installation expenses decreasing.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROFILED SHUTTER INSTALLATION IN WELL | 2006 |
|
RU2307916C1 |
METHOD TO INSTALL PROFILED SHUTTER INSIDE WELL | 2006 |
|
RU2321723C1 |
METHOD FOR PROFILE SHUTTER INSTALLATION IN WELL | 2007 |
|
RU2339786C1 |
SHOE FOR PLACEMENT OF PROFILE SHUTTER IN WELL | 2010 |
|
RU2421596C1 |
METHOD FOR ISOLATION OF LEAKAGE INTERVAL OF PRODUCTION STRING OF WELL WITH EXPANDABLE FLY | 2023 |
|
RU2824451C1 |
METHOD OF INSTALLING SECTION-SHAPED OVERLAPPING DEVICE IN WELL | 2007 |
|
RU2346139C1 |
INSULATION METHOD OF TROUBLE SOME ZONES IN WELL BY SHAPED COVERING DEVICE | 2010 |
|
RU2418151C1 |
METHOD OF REINFORCEMENT OF WELL TROUBLESOME ZONE USING SHAPED SHUTTER | 2014 |
|
RU2548269C1 |
WELL PROFILE SHUTTER INSTALLATION METHOD | 2008 |
|
RU2379464C1 |
METHOD OF PROFILE SHUTTER INSTALLATION IN WELL | 2009 |
|
RU2392416C1 |
Authors
Dates
2008-05-27—Published
2006-11-29—Filed