METHOD AND DEVICE FOR WELL TESTING WITH THE USE OF SUBMERSED PUMPING EQUIPMENT Russian patent published in 2008 - IPC E21B47/00 F04C11/00 

Abstract RU 2321740 C2

FIELD: hydrocarbon deposit development, particularly to operate wells having highly-viscous oil products.

SUBSTANCE: method involves measuring producing well yield with the use of submersed pumping equipment including screw pump, wherein the screw pump is activated by means of submersible hydraulic positive displacement motor and is connected to pipe string provided with sealing means and packer and inserted in well, pipe string is made as continuous flexible pipe arranged so that sealing means pass in packer mandrel; injecting working liquid into flexible pipe; pumping out working liquid mixed with hydrocarbon through hole annuity; measuring flow rate of liquid going out of well; determining production index of well and choosing screw pump for well operation. Device for described method realization comprises packer with mandrel, sealing means, hydraulic drive and screw pump. Said components may be removed from well and are suspended to flexible pipe so that sealing means are inserted in packer mandrel.

EFFECT: decreased pumping equipment lowering and lifting time, reduced power inputs and well testing costs.

4 cl, 1 dwg

Similar patents RU2321740C2

Title Year Author Number
METHOD OF SIMULTANEOUS STAGE OPERATION AND PUMPING OF TWO FORMATIONS WITH ONE WELL, AND DEVICE FOR ITS IMPLEMENTATION 2011
  • Baldenko Dmitrij Fedorovich
  • Baldenko Fedor Dmitrievich
  • Baletinskikh Denis Ivanovich
  • Selivanov Sergej Mikhajlovich
RU2477367C1
PLANT FOR SIMULTANEOUS OIL PRODUCTION FROM TWO FORMATIONS 2016
  • Mommert Karl-Heinz
  • Subbotin Vitalij Alekseevich
RU2630835C1
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS 2014
  • Malykhin Igor' Aleksandrovich
RU2552555C1
METHOD OF OIL RESERVOIR DEVELOPMENT 2020
  • Khuzin Rinat Raisovich
  • Salikhov Dinar Albertovich
  • Andreev Vadim Evgenevich
  • Dubinskij Gennadij Semenovich
  • Pepelyaev Dmitrij Valerevich
  • Stefanovich Yurij Nikolaevich
RU2747200C1
METHOD FOR SEPARATE PRODUCTION RATE MEASUREMENT AT DUAL OPERATION OF BOREHOLE COMPLETE WITH ELECTRIC CENTRIFUGAL PUMP 2014
  • Valeev Asgar Maratovich
  • Kostilevskij Valerij Anatol'Evich
  • Guzairov Il'Dar Shamilevich
  • Medvedev Petr Viktorovich
  • Khajretdinov Rishat Rasulovich
RU2567249C1
METHOD OF INCREASING PRODUCTIVITY OF DEVELOPMENT WELLS AND INJECTION CAPACITY OF INJECTION WELLS 2016
  • Zakirov Sumbat Nabievich
  • Drozdov Aleksandr Nikolaevich
  • Zakirov Ernest Sumbatovich
  • Drozdov Nikolaj Aleksandrovich
  • Indrupskij Ilya Mikhajlovich
  • Anikeev Daniil Pavlovich
  • Ostapchuk Sofya Sergeevna
RU2620099C1
METHOD OF DEVELOPING WELL OIL RESERVOIR WITH HORIZONTAL TERMINATION 2015
  • Khisamov Rais Salikhovich
  • Nazimov Nafis Anasovich
  • Salikhov Mirsaev Mirgazyamovich
  • Mukhliev Ilnur Rashitovich
  • Sagidullin Lenar Rafisovich
RU2590918C1
METHOD FOR DUAL OPERATION OF WATER-PRODUCING WELL EQUIPPED WITH ELECTRIC CENTRIFUGAL PUMP 2012
  • Valeev Marat Davletovich
  • Kostilevskij Valerij Anatol'Evich
  • Medvedev Petr Viktorovich
  • Vedernikov Vladimir Jakovlevich
  • Ramazanov Gabibjan Salikh'Janovich
  • Ishmurzin Rafis Raisovich
RU2513796C1
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION 2013
  • Vasil'Ev Ivan Vladimirovich
  • Indrupskij Il'Ja Mikhajlovich
  • Zakirov Ehrnest Sumbatovich
  • Anikeev Daniil Pavlovich
RU2531414C1
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) 2004
  • Sharifov Makhir Zafar Ogly
  • Leonov Vasilij Aleksandrovich
  • Musaverov Rinat Khadeevich
  • Nabiev Adil Dakhil Ogly
  • Ibadov Gakhir Gusejn Ogly
  • Kuznetsov Nikolaj Nikolaevich
  • Sineva Julija Nikolaevna
RU2305170C2

RU 2 321 740 C2

Authors

Gotlib Mikhail Vladilenovich

Dates

2008-04-10Published

2005-08-30Filed