FIELD: nuclear power engineering; manufacturing fuel assemblies for nuclear power reactors.
SUBSTANCE: spacer grid subchannels are tightly disposed in rim without forming gaps between assembled subchannel field and rim; pre-welding assembly of subchannel field is conducted in conductor using multiple-cam chuck; spacer grid subchannels are installed between conductor platform pins on its horizontal surface so that platform pins are disposed in space between subchannels and conductor stepped jaws and set apart; after that conductor stepped jaws are brought together to compress bottom part of subchannel field by projections of stepped jaws; rim is fitted into space formed between top part of subchannel field and vertical surfaces of conductor stepped jaws while holding it on horizontal surfaces of stepped jaws, then the latter are set apart again and rim is rammed until conductor platform is set down; subchannels are locked together and with rim and are extracted in this condition from conductor, whereupon they are transferred to welding position; after welding and heat treatment spacer grid is subjected to comprehensive inspections.
EFFECT: improved quality of spacer grids produced using proposed method.
1 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MANUFACTURING NUCLEAR REACTOR FUEL ASSEMBLY | 2003 |
|
RU2255383C2 |
METHOD FOR PRODUCING SPACER GRID FROM ZIRCONIUM ALLOY | 2003 |
|
RU2244348C2 |
MANUFACTURING METHOD OF SPACER GRID OF NUCLEAR REACTOR FUEL ASSEMBLY, AND DEVICE FOR REALISATION THEREOF | 2007 |
|
RU2360306C2 |
ROBOT MODULE FOR RESISTANCE SPOT WELDING | 2005 |
|
RU2304498C2 |
WELDING TECHNIQUE FOR SPACER GRIDS OF NUCLEAR- REACTOR FUEL ASSEMBLIES | 1998 |
|
RU2152085C1 |
METHOD FOR MANUFACTURING FUEL ASSEMBLY SPACER GRIDS | 2002 |
|
RU2246769C2 |
METHOD FOR MANUFACTURING SPACER GRID OF NUCLEAR-REACTOR FUEL ASSEMBLY | 2002 |
|
RU2246768C2 |
METHOD FOR PRODUCING SPACER GRIDS FOR NUCLEAR REACTOR FUEL ASSEMBLY | 2006 |
|
RU2322710C2 |
METHOD OF MAKING REMOTE FUEL ASSEMBLY GRID OF NUCLEAR REACTOR | 2007 |
|
RU2351027C2 |
METHOD TO MANUFACTURE SPACING GRID OF NUCLEAR REACTOR FUEL ASSEMBLY | 2010 |
|
RU2450374C1 |
Authors
Dates
2008-04-20—Published
2006-06-01—Filed