FIELD: nuclear power engineering.
SUBSTANCE: proposed method is used for manufacturing fuel assemblies for type VVER-1000 and VVER-440 reactors. In order to check spacer grid for passability it is placed in machine between two covers with depressions that follow grid outline and blind holes coaxial to each subchannel of grid accommodating calibrated balls, then it is tuned together with covers through 180 deg., subchannels of inadequate caliber are detected and burnished by means of drift. For checking diameter of circumference inscribed in subchannel the grid is placed in machine equipped with large-diameter calibrating balls, subchannels through which these balls have passed are detected and squeezed by means of clamping tool with jaws disposed in holes between subchannels. Decision on quality of spacer grid subchannels is taken by sticking of balls in them as spacer grid is turned in machine through 180 deg. Balls of different diameters are differently colored.
EFFECT: enhanced quality and yield of spacer grids.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING REMOTE FUEL ASSEMBLY GRID OF NUCLEAR REACTOR | 2007 |
|
RU2351027C2 |
MANUFACTURING METHOD OF SPACER GRID OF NUCLEAR REACTOR FUEL ASSEMBLY, AND DEVICE FOR REALISATION THEREOF | 2007 |
|
RU2360306C2 |
METHOD FOR MANUFACTURING SPACER GRID OF NUCLEAR REACTOR FUEL ASSEMBLY | 2002 |
|
RU2265900C2 |
METHOD FOR MANUFACTURING FUEL ASSEMBLY SPACER GRIDS | 2002 |
|
RU2246769C2 |
METHOD TO MANUFACTURE SPACING GRID OF NUCLEAR REACTOR FUEL ASSEMBLY | 2010 |
|
RU2450374C1 |
NUCLEAR REACTOR FUEL ASSEMBLY | 2002 |
|
RU2223557C2 |
METHOD FOR MANUFACTURING FUEL-ASSEMBLY SPACER GRIDS | 2002 |
|
RU2223558C2 |
METHOD FOR MANUFACTURING NUCLEAR REACTOR FUEL ASSEMBLY SPACER GRID | 2006 |
|
RU2322709C2 |
METHOD AND SPACER GRID FOR PREVENTING BURRS ON FUEL ELEMENTS | 1999 |
|
RU2175456C2 |
METHOD FOR PRODUCING SPACER GRIDS FOR NUCLEAR REACTOR FUEL ASSEMBLY | 2006 |
|
RU2322710C2 |
Authors
Dates
2005-01-10—Published
2003-03-07—Filed