FIELD: construction, particularly dredgers or soil-shifting machines for horizontal holes digging-out, namely for delivery main crossing construction.
SUBSTANCE: method involves alternately drawing two protective cases in previously drilled and reamed hole with the use of drilling rig; covering highly-abrasive rock at hole inlet and outlet with the cases by means of stop collars, safety-guiding collars and special removable plugs.
EFFECT: prevention of isolation pipeline coating damage during pipeline drawing through hole having pebble or other hard material in surrounding rock at hole inlet and outlet.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
PIPELINE PULLING METHOD IN HORIZONTAL WELL | 2019 |
|
RU2734198C1 |
METHOD OF CONSTRUCTION OF UNDERGROUND PASSAGE IN SOILS WITH ALTERNATION OF STABLE AND COLLAPSING SECTIONS | 2018 |
|
RU2691043C1 |
METHOD OF PROTECTIVE SLEEVES INSTALLATION IN HORIZONTAL HOLE UNDER WATER OR OTHER BARRIERS | 2014 |
|
RU2561399C1 |
METHOD TO CONTROL BALLASTING OF PIPELINE PULLED IN HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES BY HORIZONTAL DRILLING PLANT | 2008 |
|
RU2384673C2 |
METHOD FOR PIPELINE PULLING THROUGH HORIZONTAL HOLE UNDER WATER AND OTHER NATURAL AND ARTIFICIAL OBSTACLES | 2005 |
|
RU2313636C2 |
METHOD OF TRENCHLESS PIPELINING MAINLY UNDER WATER BARRIERS AND PROTECTED AREAS | 2007 |
|
RU2330917C1 |
PROCEDURE FOR DEVELOPMENT OF PLACERS | 2009 |
|
RU2390627C1 |
METHOD OF PIPELINE TRENCHLESS LAYING | 2000 |
|
RU2189422C2 |
PROCESS OF ERECTION OF PIPE-LINE, PROCESS OF DRAGGING-THROUGH OF PIPE-LINE WITH PROTECTIVE ENVELOPE AND FACILITY FOR ITS IMPLEMENTATION | 2001 |
|
RU2205923C1 |
METHOD FOR REDUCTION OF TORSION TORQUES OF DRILLING RIG AT STAGES OF PRELIMINARY WELL EXPANSION AND IN PROCESS OF WELL PREPARATION OF PIPELINE DRAGGING | 2008 |
|
RU2399742C2 |
Authors
Dates
2008-04-27—Published
2005-12-05—Filed