PIPELINE PULLING METHOD IN HORIZONTAL WELL Russian patent published in 2020 - IPC E21B7/04 E02F5/18 F16L1/28 

Abstract RU 2734198 C1

FIELD: construction.

SUBSTANCE: invention relates to construction of main pipeline crossings by horizontal directional drilling. Additional pipe is welded to the head part of the pipeline being pulled, the diameter of which is equal to the diameter of the pipeline being pulled, but having less bending stiffness. From the head of the additional pipe, the pipeline is pulled from the head of the additional pipe to the drilled horizontal well with simultaneous expansion of the said well till the entire length of the additional pipe is out of the well; at the absence of inadmissible damages on the additional pipe the above pipe is cut off.

EFFECT: technical result is wider field of use, as well as higher reliability of laying pipelines on crossings through natural and artificial obstacles.

1 cl, 3 dwg

Similar patents RU2734198C1

Title Year Author Number
METHOD OF PIPE LAYING UNDER WATER OBSTACLES 2007
  • Seleznev Gennadij Anatol'Evich
RU2342585C2
METHOD OF CONSTRUCTION OF UNDERGROUND PASSAGE IN SOILS WITH ALTERNATION OF STABLE AND COLLAPSING SECTIONS 2018
  • Demidenko Anatolij Ivanovich
  • Maksimov Aleksandr Sergeevich
  • Semkin Dmitrij Sergeevich
RU2691043C1
METHOD TO CONTROL BALLASTING OF PIPELINE PULLED IN HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES BY HORIZONTAL DRILLING PLANT 2008
  • Zhvachkin Sergej Anatol'Evich
  • Bakanov Jurij Ivanovich
  • Suslikov Sergej Petrovich
  • Geras'Kin Vadim Georgievich
  • Shabrov Sergej Nikolaevich
  • Kucherenko Sergej Anatol'Evich
  • Klimov Vjacheslav Vasil'Evich
  • Kobeleva Nadezhda Ivanovna
  • Egorov Vladimir Aleksandrovich
RU2384673C2
METHOD OF TRENCHLESS PIPELINING MAINLY UNDER WATER BARRIERS AND PROTECTED AREAS 2007
  • Pyndak Viktor Ivanovich
  • Lapynin Jurij Gennadievich
  • Makarenko Andrej Nikolaevich
RU2330917C1
DEVICE FOR DIRECTIONAL EXPANSION OF A PILOT WELL 2022
  • Nagovitsyn Aleksandr Leonidovich
RU2778870C1
METHOD FOR LAYING OF PIPELINE UNDER WATER OBSTACLE 2008
  • Seleznev Gennadij Anatol'Evich
RU2382927C1
SYSTEM FOR MONITORING THE PROFILE OF THE BOTTOM OF A BOREHOLE AT THE STAGES OF EXPANSION WHEN BUILDING COMMUNICATIONS BY THE HORIZONTAL DIRECTIONAL DRILLING METHOD 2021
  • Tareeva Elena Alekseevna
  • Gurman Dmitrii Aleksandrovich
  • Lankov Aleksei Anatolevich
  • Liakhov Aleksandr Vladimirovich
RU2771433C1
METHOD OF TRENCHLESS LAYING OF PIPELINES 0
  • Kamyshev Mikhail Alekseevich
SU1276769A1
METHOD FOR PIPELINE DRAWING THROUGH HORIZONTAL WELL UNDER WATER AND OTHER NATURAL OBSTACLES 2005
  • Bakanov Jurij Ivanovich
  • Suslikov Sergej Petrovich
  • Geras'Kin Vadim Georgievich
  • Shabrov Sergej Nikolaevich
  • Kucherenko Sergej Anatol'Evich
  • Kobeleva Nadezhda Ivanovna
  • Vasil'Ev Maksim Igorevich
RU2323304C2
METHOD OF PIPELINE TRENCHLESS LAYING 2000
  • Maksjutov I.F.
  • Akhmetshin G.D.
  • Galljamov N.F.
  • Nabiev F.N.
  • Jusupov R.A.
  • Nikitenko Ju.N.
  • Khaljavkin V.I.
RU2189422C2

RU 2 734 198 C1

Authors

Mayants Yurij Anatolevich

Shiryapov Dmitrij Igorevich

Elfimov Aleksandr Vasilevich

Dates

2020-10-13Published

2019-10-14Filed