FIELD: construction, particularly erection of cast-in-place wall of reinforced concrete.
SUBSTANCE: method involves mounting form for outer wall part construction; concreting outer wall part and stripping the form; assembling form for inner wall part construction in the same order; concreting inner wall part with void creation between inner and outer wall parts and stripping the form; placing heater in the voids. Ties made as reinforced columns are created during inner wall part concreting. The ties are made by connection of pre-formed monolithic members of outer wall part with part of inner wall to be concreted. Mutual wall structure stressing is carried out by reinforcing of outer and inner wall parts associated with formed column reinforcement.
EFFECT: increased seismic stability and strength, as well as improved heat-insulation ability and decreased wall erection time.
1 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
STANDARD STRUCTURAL CURB BLOCK | 2007 |
|
RU2392394C2 |
STRUCTURAL FORMWORK BLOCK FOR OPENINGS | 2013 |
|
RU2525242C1 |
METHOD TO ERECT SITE-CAST SKELETON BUILDING WITH DECORATIVE OUTER FINISH | 2009 |
|
RU2421580C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
LOW-RISE HOUSE CONSTRUCTION METHOD | 2023 |
|
RU2816731C1 |
WALL STRUCTURE | 2023 |
|
RU2817846C1 |
METHOD OF ERECTION OF MULTI-STOREY BUILDING WITH ENERGY-SAVING MULTILAYER WALLS | 2019 |
|
RU2732741C1 |
BUILDING STRUCTURE AND METHOD FOR ITS ERECTION | 1999 |
|
RU2170309C1 |
READY-BUILT AND SOLID-CAST BUILDING CONSTRUCTION SYSTEM | 2008 |
|
RU2376424C1 |
STRUCTURAL SYSTEM OF MULTISTORY BUILDING AND PROCESS OF ITS ERECTION ( VARIANTS ) | 2000 |
|
RU2197578C2 |
Authors
Dates
2008-04-27—Published
2005-11-21—Filed