FIELD: oil and gas industry.
SUBSTANCE: invention is referred to a petroleum industry and can be applied at development of reservoir with a high-viscosity oil or bitumen. It provides efficiency upgrading of warm-up of a bottom-hole zone of a hole, oil viscosity decreasing and increasing of a reservoir oil recovery. Essence of invention: the method includes electric warm-up of a productive strata and bleeding of oil by holes. According to the invention a breaking of electric connection between a part of a casing string in the range of productive strata and other parts of a casing string will be organised in a hole. The tubular annulus between a tubing string and a casing string is space filled by dielectric fluid. Tubing string isolation from down hole equipment, pipe lines on a hole and casing string mouth is organised. An electric contact between a tubing string and a casing string in the range of productive strata is provided. An electric current is fed to a tubing string.
EFFECT: efficiency upgrading of warm-up of a bottom-hole zone of a hole, oil viscosity decreasing and increasing of a reservoir oil recovery.
2 cl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2008 |
|
RU2347068C1 |
WELL | 2008 |
|
RU2354816C1 |
METHOD FOR EXTRACTING AN OIL DEPOSIT | 2003 |
|
RU2241118C1 |
METHOD TO CREATE GRAVEL FILTER IN HORIZONTAL BORE | 2007 |
|
RU2317404C1 |
METHOD FOR HIGH-VISCOUS OIL OR BITUMEN FIELD DEVELOPMENT | 2005 |
|
RU2274742C1 |
METHOD FOR ELECTRIC LOGGING OF CASED WELL | 2007 |
|
RU2352964C1 |
HIGHLY VISCOUS OIL FIELDS PRODUCTION METHOD | 2008 |
|
RU2379494C1 |
METHOD FOR EXTRACTING OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287677C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2599118C1 |
METHOD FOR EXTRACTING DEPOSIT OF HIGH VISCOSITY OIL OR BITUMEN | 2005 |
|
RU2287679C1 |
Authors
Dates
2008-05-27—Published
2007-06-19—Filed