FIELD: oil and gas industry, particularly construction of wells with horizontal and inclined bores having complicated configurations.
SUBSTANCE: method involves penetrating productive reservoir and installing casing pipe extending up to productive reservoir roof; delivering gravel composition to horizontal well bore by means of flow string; circulating liquid to wash-out gravel composition from flow string into horizontal well bore along with simultaneous flow string lifting; compacting gravel composition by periodic flow string lifting stopping along with gravel composition washing-out and flow string lifting so that flow string rests upon developed gravel filter.
EFFECT: possibility to create gravel filter during construction of well having inclined and horizontal bores having complicated configurations.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSOLIDATING OF INCOMPETENT FORMATION | 2014 |
|
RU2558080C1 |
WELL CONSTRUCTION FINISHING METHOD | 2011 |
|
RU2509875C2 |
METHOD OF FORMATION OF WELL GRAVEL FILTER | 2001 |
|
RU2213207C2 |
METHOD AND DEVICE FOR PROVIDING VERTICAL AND INCLINED WELLS WITH GRAVEL FILTERS | 2001 |
|
RU2261957C2 |
PETROLEUM DEPOSIT DEVELOPMENT PROCESS | 2007 |
|
RU2325516C1 |
METHOD OF DEVELOPMENT OF GRAVEL ENVELOPE IN WELL | 2009 |
|
RU2393339C1 |
CONSTRUCTION FINISHING METHOD FOR HORIZONTAL STEAM INJECTOR | 2012 |
|
RU2515740C1 |
METHOD OF SHANK INSTALLATION IN WELL | 2019 |
|
RU2725398C1 |
METHOD AND DEVICE FOR SAND PLUG REMOVAL FROM WELL BOTTOM AND GRAVEL FILTER AGGREGATION | 2002 |
|
RU2267005C2 |
METHOD OF GRAVEL FILTER CONSTRUCTION | 2007 |
|
RU2374431C2 |
Authors
Dates
2008-02-20—Published
2007-02-13—Filed