FIELD: oil and gas.
SUBSTANCE: invention is referred to processes and devices for extraction of liquid and gaseous minerals including oil and gas, and can be used at a construction of gas, gas-condensate, oil and other holes, including in slightly cemented and friable headers. According to the method a production string before formation-collector opening is blew off and cemented, a production string shoe is installed in a base surface of the tyre cover bridging a formation-collector, the tightness of a production string is validated, a cement sleeve is drilled over, and before descent of oilwell tubings a cavern is constructed on boundary of a formation-collector and a tyre cover which is reamed in a horizontal direction to achievement of the size which magnitude is defined on analytical form.
EFFECT: increase of well efficiency.
| Title | Year | Author | Number | 
|---|---|---|---|
| WELL COMPLETION METHOD | 2013 | 
 | RU2533783C1 | 
| METHOD FOR RAPID ISOLATION OF ABSORBING ZONE IN WELL WITH HIGH-FLOW INTER-COMPARTMENT FLOW FROM SUPERHIGH STRATUM SATURATED WITH STRONG BRINES, AND PACKER EQUIPMENT FOR IMPLEMENTATION THEREOF | 2020 | 
 | RU2741978C1 | 
| PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION | 2000 | 
 | RU2165516C1 | 
| PROCEDURE FOR COMPLETION OF STRIPPER WELL | 2015 | 
 | RU2586337C1 | 
| CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 | 
 | RU2386787C9 | 
| METHOD FOR OIL PRODUCTION FROM FORMATION WITH ABNORMALLY LOW FORMATION PRESSURE | 2012 | 
 | RU2501940C1 | 
| WELL KILLING METHOD | 2004 | 
 | RU2283942C2 | 
| METHOD FOR INVESTIGATION OF HEIGHT AND DIRECTION OF FORMATION FRACTURING | 2019 | 
 | RU2713285C1 | 
| COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 | 
 | RU2793351C1 | 
| METHOD OF WELL COMPLETION | 1997 | 
 | RU2140521C1 | 
Authors
Dates
2008-06-10—Published
2006-03-29—Filed