FIELD: construction.
SUBSTANCE: in the branch connection of a framing rack with girders one girder is executed a form of a basic screed coat with grooves for the racks installation, and another - in the form of a floor beam. The rack, a basic screed coat and a floor beam are executed from a board of one size, and the connecting element of branch is executed in the form of a welded structure from two L-steels from a U-section, located mirror to each other in one plane on distance from each other equal to a thickness of a basic screed coat and a plate of a U-section welded in a butt end to L-steels and supplied with an open groove from its adjunction to L-steels for placing of a basic screed coat. On horizontal and vertical regiments of L-steels and on a plate the holes for their screwed connection correspondingly on basic screed coats, racks and a floor beam are executed. The system in addition contains branch of a racks T-joint of longitudinal and cross-section walls.
EFFECT: strength enhancement of a framing joint connection.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIT OF FLOOR JOINT OF SPATIAL BUILDING FRAME FROM THREE MODULES | 2009 |
|
RU2400605C1 |
UNIT OF FLOOR JOINT OF SPATIAL BUILDING FRAME ELEMENTS | 2009 |
|
RU2395649C1 |
FRAMED PANEL | 2015 |
|
RU2602252C1 |
FRAME-PANEL BUILDING | 2008 |
|
RU2380492C2 |
PREFABRICATED BLOCK-MODULAR BUILDING (OPTIONS) | 2023 |
|
RU2811578C1 |
BUILDING AND A FRAMEWORK FOR COVERING THE BUILDING | 1993 |
|
RU2046909C1 |
CONNECTION FOR METAL FRAME ELEMENTS OF PREFABRICATED BUILDINGS | 2022 |
|
RU2799216C1 |
FRAME-PANEL BUILDING | 2011 |
|
RU2582155C2 |
PREFABRICATED FRAME BUILDING | 2019 |
|
RU2713847C1 |
SET FOR HOUSE BUILDING | 2003 |
|
RU2233367C1 |
Authors
Dates
2008-06-20—Published
2007-06-05—Filed