FIELD: construction.
SUBSTANCE: invention relates to the connection of the metal frame of buildings. The connection of the elements of the metal frame of prefabricated buildings comprises a hollow body configured for using it as corner fittings of the floor, corner interfloor fittings and corner ceiling fittings of the load-bearing frame of a prefabricated building. The connection is equipped with rigging, mounting, foundation holes and fasteners consists of upper and lower L-shaped shelves and side walls formed by an internal W-shaped profile and an external L-shaped corner with fixing perforated plates fixed at its ends.
EFFECT: reduction of material consumption for the connection.
8 cl, 12 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| PREFABRICATED BLOCK-MODULAR BUILDING (OPTIONS) | 2023 | 
 | RU2811578C1 | 
| UNIT FOR CONNECTION OF ELEMENTS OF METAL FRAME OF PREFABRICATED BUILDINGS (VERSIONS) | 2019 | 
 | RU2724575C1 | 
| ANTI-VANDAL FACADE CLADDING SYSTEM | 2023 | 
 | RU2808281C1 | 
| CONNECTION SYSTEM OF BUILDING SPATIAL FRAME ELEMENTS | 2007 | 
 | RU2327014C1 | 
| MODULAR BUILDING | 2023 | 
 | RU2826395C1 | 
| MOBILE FRAME-MODULAR BUILDING FRAME | 2022 | 
 | RU2786917C1 | 
| UNIT OF FLOOR JOINT OF SPATIAL BUILDING FRAME FROM THREE MODULES | 2009 | 
 | RU2400605C1 | 
| METHOD OF MAKING PREFABRICATED BUILDINGS | 2023 | 
 | RU2822836C1 | 
| METHOD OF FASTENING NON-BEARING WALL REINFORCED CONCRETE PANELS TO BUILDING STRUCTURES AND ARRANGEMENT OF ATTACHMENT POINT FOR ITS IMPLEMENTATION | 2023 | 
 | RU2821627C1 | 
| UNIT OF FLOOR JOINT OF SPATIAL BUILDING FRAME ELEMENTS | 2009 | 
 | RU2395649C1 | 
Authors
Dates
2023-07-04—Published
2022-12-27—Filed