FIELD: heating.
SUBSTANCE: proposal is given for a method of controlling hermeticity of vacuum systems of turbo-installations through visual observation of the leakage of medium through a turbine condenser. The vacuum system hermeticity control is carried out during operation of turbo-installation of a steam pressure condenser, at the places where steam leaks from the condenser through increasing the pressure of the exhaust steam in the condenser to excess of 0.05-0.2 kgf/cm2 by temporarily closing the injector.
EFFECT: increased reliability and economy of the thermal power plant through increase in the quality of equipment and elimination of air cupping spots in the vacuum system of the turbo-installation.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LEAKAGE TEST OF VACUUM SYSTEMS OF TURBINE PLANTS | 2006 |
|
RU2319128C1 |
METHOD OF TURBINE PLANT VACUUM SYSTEM AIRTIGHTNESS MONITORING | 2006 |
|
RU2324824C1 |
THERMAL POWER PLANT | 2006 |
|
RU2324825C1 |
METHOD OF CONTROLLING AIR-TIGHTNESS OF VACUUM SYSTEMS OF TURBO-INSTALLATIONS | 2015 |
|
RU2580850C1 |
METHOD OF CONTROLLING AIR-TIGHTNESS OF VACUUM SYSTEMS OF TURBO-INSTALLATIONS | 2015 |
|
RU2580847C1 |
THERMAL POWER STATION OPERATION METHOD | 2003 |
|
RU2237814C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2299334C1 |
THERMAL POWER STATION | 2003 |
|
RU2237813C1 |
HEAT AND POWER PLANT OPERATION METHOD | 2005 |
|
RU2298663C1 |
THERMAL POWER STATION | 2005 |
|
RU2309259C2 |
Authors
Dates
2008-06-27—Published
2006-09-14—Filed