FIELD: mechanics.
SUBSTANCE: folding and unfolding in a tower crane with a folded post and arm are performed with drives or lifts. As the sequence of operations for folding and unfolding is chosen with a switch and a controller, the lifts are put in operation in sequence accordingly to a preset sequence of automatic actions (L1, L2, L3, L4) corresponding to a chosen actions order. Following the actions order is controlled with a set of sensors which register intermediate or final positions of post components and/or components of the arm of the tower crane.
EFFECT: allows automatic transforming of a tower crane from a folded transport state to unfolded operating state and vice versa.
10 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR LIFTING AND LAYING MAST AND LIFTING BOOM OF LIFTING CRANE | 2003 |
|
RU2307062C2 |
TOWER CRANE THREE-MEMBER MAST WITH FOLDING AND UNFOLDING DEVICE | 1998 |
|
RU2193007C2 |
AUTOMATICALLY MOUNTABLE TOWER LIFTING CRANE WITH BOOM SIDEWISE FOLDED FOR TRANSPORTATION | 1998 |
|
RU2189936C2 |
LIFT CRANE | 1996 |
|
RU2169695C2 |
FOLDING TOWER CRANE | 2023 |
|
RU2817662C1 |
TOWER CRANE | 1992 |
|
RU2065397C1 |
CRANE WITH MULTIFUNCTIONAL BOOM | 2000 |
|
RU2271330C2 |
DEVICE FOR OPENING OR FOLDING CRANE BOOM HEAD MEMBERS | 2000 |
|
RU2256599C2 |
AUTOMATED MOUNTING CRANE WITH SELF-FOLDING BOOM | 1996 |
|
RU2161119C2 |
LIFTING CRANE AUTOMATICALLY FOLDING BOOM | 1992 |
|
RU2083473C1 |
Authors
Dates
2008-07-10—Published
2003-01-08—Filed