FIELD: tower crane with automatic folding and unfolding device. SUBSTANCE: tower crane mast 5 consists of three members, namely, lower member 6, intermediate mast folding member 7 and upper member 8. Mast lower member 6 is hinge connected by base to slewing chassis 3. Intermediate mast folding member 7 is hinge connected to top of lower member 6. Mast upper member 8 is hinge connected to intermediate member 7. Load-lifting boom 13 of crane installed on top of mast upper member 8 carries mast folding and unfolding device. This device has at least one strut 23, tension member 30 and mechanized drive means 27, 34. Strut is hinge connected to slewing chassis 3 and to intermediate member 7 of mast 5. Tension member 30 is hinge connected to mast intermediate member 7 and to upright 19 installed on load-lifting boom 13. Mechanized drive means can include drive lift 27 hinge connected to slewing chassis 3 and to lower member 6 of mast 6 of mast 5, and crank mechanism 34 installed at level of mast intermediate member 7. EFFECT: possibility of transportation by motor roads in folded state. 7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
LIFT CRANE | 1996 |
|
RU2169695C2 |
AUTOMATICALLY MOUNTABLE TOWER LIFTING CRANE WITH BOOM SIDEWISE FOLDED FOR TRANSPORTATION | 1998 |
|
RU2189936C2 |
TOWER CRANE | 1992 |
|
RU2065397C1 |
LIFTING CRANE AUTOMATICALLY FOLDING BOOM | 1992 |
|
RU2083473C1 |
METHOD OF SAFE CONTROL/MONITORING OF TOWER CRANE FOLDING AND UNFOLDING AND DEVICE FOR IMPLEMENTATION OF THIS METHOD | 2003 |
|
RU2328441C2 |
METHOD OF AND DEVICE FOR MOUNTING TOWER CRANE BOOM | 1994 |
|
RU2145934C1 |
METHOD AND DEVICE FOR MOUNTING TENSION GUYS OF TOWER CRANE LOAD-LIFTING BOOM | 1997 |
|
RU2200699C2 |
AUTOMATED MOUNTING CRANE WITH SELF-FOLDING BOOM | 1996 |
|
RU2161119C2 |
MAST-LIFTING DEVICE FOR TOWER CRANE WITH TELESCOPIC MAST | 1998 |
|
RU2191156C2 |
DEVICE FOR LIFTING AND LAYING MAST AND LIFTING BOOM OF LIFTING CRANE | 2003 |
|
RU2307062C2 |
Authors
Dates
2002-11-20—Published
1998-07-01—Filed