FIELD: building.
SUBSTANCE: bridge made of transverse elements contains bearings and transverse elements of spans, which are dimensional steel constructions of the size equal to bridge width. Every transverse element is fitted with fulcrum pins and creepers, which are jointed in the process of point-to-point wiring of transverse elements and, between adjusting elements, forms pin connections, the position of transverse elements being fixed with respect to each other by means of their own weight to form a bearing construction of a span of the size equal to bridge width.
EFFECT: firm spans of bridge constructions.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE MADE UP FROM LONGITUDINAL ALL-SIZE ELEMENTS | 2008 |
|
RU2376413C1 |
OVERHEAD CRANE FOR MOUNTING SUPERSTRUCTURES | 2008 |
|
RU2369683C1 |
STRING DEVICE FOR ERECTION OF BRIDGES | 2007 |
|
RU2358059C1 |
DEVICE FOR INSTALLATION OF BRIDGE SPANS | 2007 |
|
RU2353725C1 |
DEVICE FOR STRING-AND-ROLLER BEAM PROTRUSION | 2007 |
|
RU2315147C1 |
LEGGED BRIDGE CONSTRUCTION GANTRY | 2006 |
|
RU2326045C1 |
SELF-PROPELLED BRIDGE BUILDER COMBINE | 2008 |
|
RU2380312C1 |
PNEUMATIC BEAM | 2007 |
|
RU2352736C1 |
SELF-PROPELLED BRIDGE-BUILDING MANIPULATOR | 2008 |
|
RU2389680C1 |
METHOD TO ERECT BASE PIER SECTION OF CABLE TRUSS BRIDGE SPAN CABLE-STAYED GIRDER AND PILOT BEAM TO REALISE THIS METHOD | 2011 |
|
RU2460838C1 |
Authors
Dates
2008-07-20—Published
2007-02-06—Filed