FIELD: construction.
SUBSTANCE: invention pertains to construction, in particular to methods of installing lagged floor structures. The method involves laying the outermost floor beams. Atter that, supports are installed in the zone of their end parts. The supports are in form of oppositely lying two unequal angle bars on the sides of the lateral edges of the floor beam. Two adjustment devices are then fitted on one side of the lateral edges of each outermost floor beam at its end support. They are temporarily fixed to lateral edges of the floor beam. The floor beams are then levelled, and then each floor beam is fixed to the vertical legs of the unequal angle bars. The adjustment device is removed, and intermediate floor beams are installed and levelled. Two layers of veneer sheets are spread onto the levelled floor beams.
EFFECT: increased accuracy of laying a floor.
5 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
FALSE FLOOR CONSTRUCTION METHOD | 2004 |
|
RU2278224C2 |
METHOD OF MAKING PARQUET FLOORS | 2010 |
|
RU2425198C2 |
METHOD FOR FLOOR BOARD TOPPING | 2021 |
|
RU2778878C1 |
PREFABRICATED FRAME BUILDING | 2019 |
|
RU2713847C1 |
BUILDING AND A FRAMEWORK FOR COVERING THE BUILDING | 1993 |
|
RU2046909C1 |
FRAME STRUCTURE | 2023 |
|
RU2823971C1 |
ADJUSTABLE SUPPORT FOR BUILDING STRUCTURES | 2001 |
|
RU2184196C1 |
LAYING METHOD OF INSTALLATION VENEER SHEETS UNDER PARQUET FLOORING | 2013 |
|
RU2564039C2 |
WOODEN FLOOR PLATE | 0 |
|
SU1767122A1 |
SECTIONAL ROLLER DRYER WITH NOZZLE CASES, DRIVE AND LOADING AND UNLOADING MECHANISMS WITH BELT CONVEYOR | 2009 |
|
RU2430004C1 |
Authors
Dates
2008-08-10—Published
2004-07-19—Filed