FIELD: construction, hydrotechnics.
SUBSTANCE: invention is attributed to cleaning methods for beds of minor rivers in permafrost zone with seasonal flow from sediments contaminated with radionuclides from radioactive solid waste handling. Removal of contaminated sediments is executed in winter by segments in downstream direction after discharge cancellation and their dewatering. Bottom ground is loosened and mechanically shaved by layers as it is freezed by natural cold with stocking it in temporary piles and subsequent transportation outside river floodplain for burying or laying in surface burial hills. To speed-up layer-by-layer freezing the net of trenches with vertical walls is cut in parallel in bottom ground depth as it freezes. Trench width is defined by parameters of equipment being used, their depth is not less than half a meter and distance between trenches corresponds to double trench depth. The invention allows to isolate from biota (for a period of not less than 100 years) the most migration suspectable solid radioactive wastes and hence to lower the risk of people irradiation.
EFFECT: lowering the risk of people irradiation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEANING TECHNOGENICALLY CONTAMINATED BOTTOM SEDIMENTS OF WATER, INCLUDING OIL AND OIL PRODUCTS | 2018 |
|
RU2688473C1 |
METHOD OF DEVELOPMENT OF UNDERFLOW GRAVEL DEPOSIT UNDER CONDITIONS OF CRYOLITE ZONE | 2007 |
|
RU2349755C2 |
METHOD OF PROCESSING AND DISPOSAL OF RADIATION-CONTAMINATED VEGETATION ON TERRITORIES OF PERMAFROST ZONE | 2009 |
|
RU2407084C1 |
METHOD FOR CONTAINER-FREE SUBSURFACE BURIAL OF SOLID RADIATION SOURCES IN ABANDONED DEEP WORKINGS OF CRYOLITE ZONE | 2003 |
|
RU2263985C2 |
METHOD FOR DISPOSAL OF SOLID RADIOACTIVE WASTES IN PERMAFROST REGIONS | 1997 |
|
RU2134459C1 |
ERECTION METHOD OF PROTECTIVE ENVELOPES OF HALF-BURIED DISPOSAL SITES OF SOLID RADIOACTIVE WASTE IN CRYOLITE ZONE | 2007 |
|
RU2357310C2 |
METHOD FOR CONSTRUCTION AND OPERATION OF SURFACE STORAGE FACILITY FOR SOLID TOXIC WASTE IN PERMAFROST ZONE | 2023 |
|
RU2806888C1 |
ERECTION METHOD OF PROTECTIVE CUSHION ABOVE DEVELOPED VERTICAL ORE BODIES UNDER PERMAFROST ZONE CONDITIONS | 2012 |
|
RU2503814C1 |
METHOD OF REPLENISHING SOIL WATER SUPPLY | 0 |
|
SU1094921A1 |
METHOD TO ERECT ICE MOORAGE IN ARCTIC SEAS | 2012 |
|
RU2493324C1 |
Authors
Dates
2008-08-20—Published
2006-05-12—Filed