FIELD: construction, superstructures.
SUBSTANCE: principle applies to construction field, partly to the method of constructing building frames without girders. The technical result of the principle involves shortening the construction period of buildings. In this method of constructing the building frame, the connection of adjoining columns and the floor slabs is done by means of stretched reinforcement bars during installation. Before tensioning of each blade of lower floor slabs, columns are placed jointly with the machining attachments. A strut is mounted under the slab, levelled together with assembly stools on the columns and are placed on these stools and stripe veneer struts and floor slabs are mounted, side beams, balcony slabs. Then concrete is poured in joints between floor slab and column edges. When the concrete gains 75% design strength, preliminary tensioning of lower blade of floor slabs is done, excluding the displacement of columns from design position.
EFFECT: reduction of building construction periods.
4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUTT JOINTING OF CEILING PLATES WITH COLUMN AND DEVICE FOR ITS IMPLEMENTATION | 2007 |
|
RU2334060C1 |
PROCESS OF TENSION OF CABLE REINFORCEMENT WHILE MANUFACTURING PREFABRICATED-MONOLITHIC FLOORS OF BUILDINGS WITH SPANNER-FREE FRAME | 2001 |
|
RU2199632C1 |
METHOD FOR REINFORCEMENT ROPE TIGHTENING DURING BUILDING ERECTION IN ACCORDANCE WITH INDUSTRIAL ERECTION SYSTEM | 2002 |
|
RU2264506C2 |
METHOD OF COLUMNS ASSEMBLY AND DEVICE FOR COLUMNS GRIPPING | 2006 |
|
RU2334067C1 |
METHOD FOR TENSIONING OF HIGH-STRENGTH REINFORCING STEEL IN MANUFACTURE OF FLOORS OF PRECAST-MONOLITHIC BUILDINGS WITH FRAME WITHOUT CROSS-BARS | 1999 |
|
RU2182627C2 |
METHOD FOR ERECTING BUILDING FRAME WITHOUT GIRDERS BY MEANS OF FLOOR LIFTING | 2002 |
|
RU2233953C2 |
METHOD OF MULTISTOREY BUILDING CARCASSING | 2007 |
|
RU2338843C1 |
METHOD OF TEST OF BUILDING FRAME UNIT | 2007 |
|
RU2331858C1 |
STRUCTURAL SYSTEM OF MULTISTORY BUILDING AND PROCESS OF ITS ERECTION ( VARIANTS ) | 2000 |
|
RU2197578C2 |
METHOD OF PRELIMINARY TENSED CONSTRUCTION FRAME AND CASING ERECTION | 2006 |
|
RU2328579C1 |
Authors
Dates
2008-05-27—Published
2006-11-16—Filed