FIELD: oil production industry.
SUBSTANCE: invention belongs to the oil production industry, and namely to the sphere of reservoir management, complicated by erosion trench of a shoelace type. Essence of the invention: the aforementioned technique involves accumulations research, specification of their oil-productiveness counters, indication of the net oil thickness of the trenches, drilling of injection and exploitation wells, injection of agents into the injection wells and oil withdrawal out of exploitation wells. According to the invention, the shoelace type accumulations are researched along the cross-cut reflection-time section seismic profiles. They additionally help to identify the spots with a maximum productive formation thickness, where the vertical wells are to be drilled, displaced in relation to well spacing. Between the two adjacent vertical wells at an equal intervals an additional vertical and horizontal wells are drilled in a mid-perpendicular plane connecting the adjacent wells. Drilled wells are used as exploitation wells; upon the water encroachment of bed or decrease in productivity some wells are used for injection of a driving agent.
EFFECT: enhancing the efficiency of reservoir management due to optimal location and exploitation of the vertical and horizontal wells, what results in a fuller oil reserve recovery.
1 dwg, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS COMPLICATED WITH EROSION CUT | 2010 |
|
RU2434124C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS COMPLICATED WITH VISEAN EROSIONAL DOWNCUTS | 2005 |
|
RU2298087C1 |
METHOD OF DEVELOPMENT OF OIL POOLS OBSTRUCTED BY EROSION TRENCH | 2007 |
|
RU2334087C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485295C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485291C1 |
METHOD FOR OIL DEPOSIT IN CARBONATE RESERVOIRS COMPLICATED BY EROSIVE CHANNEL | 2016 |
|
RU2630324C1 |
RECOVERY METHOD OF OIL DEPOSIT IN CARBONATE RESERVOIRS, COMPLICATED BY THE EROSIVE CHANNEL | 2016 |
|
RU2626483C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT COMPLICATED BY VERTICAL INTERRUPTIONS | 2015 |
|
RU2595105C1 |
MULTI-SITE OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459935C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT COMPLICATED WITH VERTICAL RUPTURE | 2010 |
|
RU2431740C1 |
Authors
Dates
2012-02-10—Published
2010-08-02—Filed