FIELD: transportation.
SUBSTANCE: facility for submarine cable trunks of connection repair contains submersible platform outfitted by driver, search engine and ballast-drainage system, accessory power system by means of cable from supplying vessel. At that submersible platform includes shipping compartment for maintenance staff, hermetic working chamber and not less then two manipulative devices. Working chamber is outfitted by located on its side surface input with gasket for insertion inwards of working chamber being repaired equipment.
EFFECT: ability of submarine cable repair at any weather or ice conditions.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REPAIR UNDERWATER CABLE COMMUNICATION LINE | 2010 |
|
RU2423766C1 |
MULTI-FUNCTIONAL COMPLEX FOR PERFORMING UNDERWATER JOBS | 2000 |
|
RU2220880C2 |
DEEP-SEA MINING COMPLEX AND TELECONTROLLED UNDERWATER ROBOT | 2002 |
|
RU2214510C1 |
DEVICE TO MAINTAIN AND REPAIR SUBMERGED COMMUNICATION CABLE MAIN LINES | 2006 |
|
RU2389638C2 |
MULTIFUNCTIONAL UNIT FOR UNDERWATER TECHNICAL WORK IMPLEMENTATION | 2017 |
|
RU2653527C1 |
UNDERWATER VESSEL FOR MAINTENANCE OF UNDERWATER MINING COMPLEXES AT ARCTIC SHELF AND OTHER UNDERWATER ENGINEERING OPERATIONS | 2016 |
|
RU2629625C1 |
METHOD OF LAYING MARINE UNDERWATER CABLES | 1994 |
|
RU2069932C1 |
MODE OF SAVING MEN OUT OF THE COMPARTMENTS OF A CAPSIZED NAVAL SHIP AND AN ARRANGEMENT FOR ITS EXECUTION | 2001 |
|
RU2275311C2 |
IMMERSIBLE TRANSFORMABLE PLATFORM AND ROBOTIC COMPLEX FOR UNDERWATER JOBS | 2010 |
|
RU2438914C1 |
METHOD OF UNDERWATER CABLE LAYING | 1995 |
|
RU2065651C1 |
Authors
Dates
2008-10-20—Published
2007-02-06—Filed