FIELD: physics, control systems.
SUBSTANCE: objective is achieved by server sending schedule context containing device control command and device control performance schedule to user, user forming device control tree using device control schedule context, implementing the command if given schedule condition is met, and reporting command implementation result to server, if necessary, allowing the server to perform device control, such as command implementation query on a given condition, or dynamic change of schedule condition.
EFFECT: device control system where server can perform dynamic control of user device control scheduling.
56 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
NETWORK CONTROL SYSTEM AND METHOD | 2005 |
|
RU2378689C2 |
SYSTEM AND METHOD OF SCHEDULING DEVICE CONTROL | 2006 |
|
RU2407053C2 |
METHOD TO CONTROL OPERATION OF COMMUNICATION TERMINAL, TERMINAL AND SYSTEM OF COMMUNICATION | 2007 |
|
RU2419998C2 |
SYSTEM AND METHOD TO TRANSFER REPORTS ON "QUALITY OF EXPERIENCE" | 2009 |
|
RU2488969C2 |
METHOD AND SYSTEM FOR CONTROLLING BUSINESS PROCESS OF AN ENTERPRISE | 2003 |
|
RU2308084C2 |
SYSTEM FOR CONTROLLING SOFTWARE TESTING | 2021 |
|
RU2774659C1 |
TARGETED QUERIES USING OMA DM PROTOCOL | 2008 |
|
RU2494554C2 |
BIDIRECTIONAL UPDATE OF GRID AND ASSOCIATED VISUALISATIONS | 2009 |
|
RU2541216C2 |
METHOD AND DEVICE FOR UNIFIED MANAGEMENT OF MOBILE DEVICES AND SERVICES | 2005 |
|
RU2376729C2 |
FEEDBACK SIGNAL POWER CONTROL | 2018 |
|
RU2745763C1 |
Authors
Dates
2008-10-27—Published
2005-07-08—Filed