FIELD: transport.
SUBSTANCE: roller for preparation of base for temporary winter roads at swamp areas contains frame, working attachment made as drum with lugs (3) installed on frame containing heat generator connected with drum. Between lugs (3) and parallel to rows of lugs (3) on drum work surface there are rubber-rope strip bands (22) covered by one-piece rubber-rope band. Lugs (3) are installed through one-piece rubber-rope band on sectors of drum work surface. Area of each sector is equal to bearing area of lug (3) and height of each sector is equal to thickness of rubber-rope strip band (22) having ropes and channels positioned parallel to its longitudinal axis. One-piece rubber-rope band is positioned in parallel to circumferences forming drum and it has some ropes perpendicular to ropes of rubber-rope strip band (22).
EFFECT: increase of efficiency, speed, quality and reliability of making temporary winter roads.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
VIBRATION ROLL TO PREPARE WINTER ROAD BEDS ON MARSHES | 2007 |
|
RU2349702C1 |
COMBINED AGGREGATE FOR PREPARATION OF FOUNDATIONS FOR ICE ROADS ON SWAMPS | 2008 |
|
RU2373322C1 |
AGGREGATE FOR SINKING WITH REINFORCEMENT OF BASIS FOR WINTER SNOW ROAD ON BOGS | 2008 |
|
RU2372441C1 |
VIBRATION PACKER | 2010 |
|
RU2439240C1 |
ROLL WITH MOVABLE LUGS TO PREPARE BEDS FOR WINTER ROADS ON MARSHES | 2007 |
|
RU2349701C1 |
ROLLER FOR FLATTENING ROAD BASES | 2008 |
|
RU2387753C1 |
DEVICE FOR CLEANING SURFACE OF MACHINE WORKING MEMBER | 1997 |
|
RU2122616C1 |
DEVICE FOR PREPARATION OF FOUNDATIONS OF ICE ROADS ON DRIED SWAMPS | 2012 |
|
RU2487210C1 |
PNEUMATIC ROLLER TO FLATTEN GROUNDWORK BASE | 2009 |
|
RU2398063C1 |
METHOD TO SPEED UP FREEZING OF BASES FOR ICE ROADS | 2010 |
|
RU2439238C1 |
Authors
Dates
2008-12-20—Published
2007-03-05—Filed