FIELD: construction, pipeline.
SUBSTANCE: invention pertains to gas transporting along the cross-country gas pipeline and may be employed in construction of subaqueous sections of cross country gas pipelines after hydraulic tests for dewatering. The method differs by the fact that, during the process of dewatering its parameters characterising operation of pumping out vacuum units, are compared with their targeted tolerances, and balance between the amount of evaporated moisture and moisture pumped out from the subaqueous section is set, should dewatering parameters deviate from the targeted tolerances - productivity of the pumping out vacuum units is adjusted and further dewatering of the cavity of the subaqueous section of the cross-country gas pipeline simultaneously with vacuuming is conducted by nitrogen purging reaching specified (design) humidity value.
EFFECT: reaching specified speed of water evaporation in vacuum environment and steam evacuation from the cavity of subaqueous section of cross - country gas pipeline.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRYING SEA GAS PIPELINE CAVITY AFTER HYDRAULIC TESTS | 2017 |
|
RU2638105C1 |
GAS PIPELINE INSIDE DEHYDRATION AT NEGATIVE TEMPERATURES | 2014 |
|
RU2578261C1 |
METHOD AND DEVICE FOR DRYING CAVITIES OF EQUIPMENT | 2001 |
|
RU2198361C2 |
GAS PIPELINE CAVITY DRYING METHOD AFTER HYDRAULIC PRESSURE TESTS ARE COMPLETED | 2008 |
|
RU2373466C1 |
DRYING PIPELINE INSIDE | 2014 |
|
RU2562873C1 |
METHOD AND DEVICE FOR DRYING GAS PIPELINES | 2005 |
|
RU2300062C2 |
MODE OF DRAINAGE OF CAVITIES OF PIPELINES AND AN ARRANGEMENT FOR ITS EXECUTION | 2004 |
|
RU2272974C2 |
METHOD FOR DRYING PROCESS PIPELINES OF COMPRESSOR SHOP | 2022 |
|
RU2809523C1 |
METHOD OF MACHINERY CAVITY DRYING AND COMPLEX FOR ITS IMPLEMENTATION | 2013 |
|
RU2536758C1 |
GAS PIPELINE DRYING METHOD | 2021 |
|
RU2777908C1 |
Authors
Dates
2009-01-10—Published
2007-11-15—Filed