FIELD: construction.
SUBSTANCE: when mounted onto lower chords of T-beams flooring slabs become slid between the beam walls from the flooring edge towards the mounting location. The device includes an extendable cross-member consisting of four telescopically connected tubular brackets each equipped with guide roller with roller bearer flanges, lifting screw equipped with rotation handle having a hoist hook attached to its end that is positioned above the flooring slab lifting loop. Having been hooked onto the cross-member the flooring slab is slid between the beam walls at the flooring edge with the guide rollers mounted onto the beams upper chords fixed on the flanges. The fixing elements lock the brackets telescopic junctures with due regard for actual distance between the beams.
EFFECT: improvement of flooring slab mounting quality; elimination of beam protrusions.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TILTING LARGE-SIZED CYLINDRICAL CARGO | 2020 |
|
RU2742665C1 |
METHOD OF COLUMNS ASSEMBLY AND DEVICE FOR COLUMNS GRIPPING | 2006 |
|
RU2334067C1 |
METHOD FOR TESTING CRAWLER VEHICLES | 0 |
|
SU1495664A1 |
METHOD TO BUILD HIGH SINGLE-STOREY AND MULTI-STOREY BUILDINGS OF PIECE MATERIALS OF LOW STRENGTH AND HIGH COMPRESSIBILITY (PANELS AND BLOCKS OF LIGHT AND CELLULAR CONCRETES, HOLLOW CERAMIC AND SILICATE BLOCKS, BRICKS, SAWN NATURAL STONES OR STONES OF REGULAR SHAPE FROM TUFF, SHELL ROCK, ETC) | 2009 |
|
RU2424402C2 |
LIFTING SYSTEM FOR MAINTAINING HIGH-RISE CONSTRUCTIONS (VERSIONS) | 2005 |
|
RU2355623C2 |
PROGRESSIVE SHUTTERING | 0 |
|
SU1649074A1 |
CRANE-MANIPULATOR PLANT | 2007 |
|
RU2354603C1 |
MOUNTING LOAD-GRIPPING DEVICE | 2002 |
|
RU2235672C2 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE AND DRIVE CARRIAGE (OPTIONS) | 1993 |
|
RU2057836C1 |
MACHINE FOR MOULDING ROOF PANELS WITH MULTIPLE VOIDS | 0 |
|
SU655541A1 |
Authors
Dates
2009-01-27—Published
2006-06-13—Filed