FIELD: transportation.
SUBSTANCE: proposed method of sorting rail carriages (4) with detachable containers involves splitting up the carriages, putting the wagons on goods lines (2) in accordance with the splitting plan, detaching containers from the carriages on the track of the container platform, unloading them into storage containers (3), and detachment of storage containers and loading them into sorted carriages. After loading and unloading, the wagons are grouped together according to destination. Storage containers are put into the space between goods lines. The space between the goods lines is made from rail heads on one level. Detachment and putting the storage containers onto road or water transport is arranged.
EFFECT: provision for processing a large number of container trains on lines with considerable volume of the container trains, carry out practically complete containerisation of goods traffic.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SORTING AND BREAKING-UP CONSISTS WITH DETACHABLE CONTAINERS | 2007 |
|
RU2346837C1 |
METHOD OF MARSHALLING RAILWAY TRAINS WITH REMOVABLE TANKS | 0 |
|
SU870228A1 |
METHOD FOR MOVING CARGO | 2021 |
|
RU2773792C1 |
TERMINAL FOR FLOW CONTAINER PROCESSING BASED ON KUZOVKOV'S DOUBLE INCLINE | 2008 |
|
RU2388680C2 |
METHOD FOR TRANSPORTATION OF PERISHABLE GOODS BY ELECTRIFIED RAILWAYS, SITE FOR PICKING/INSTALLATION OF PERISHABLE GOODS FROM RAILWAY PLATFORMS AND CONTAINER TRAIN | 2019 |
|
RU2739638C2 |
RAILROAD NETWORK DIRECTION CONTROL SYSTEM BASED ON CARS VIRTUAL SORTING | 2020 |
|
RU2738778C1 |
METHOD OF LOADING AND UNLOADING OF CONTAINER CARRIED BY RAILWAY FLAT CARS | 1998 |
|
RU2127703C1 |
0 |
|
SU386425A1 | |
METHOD OF PLANNING RAILWAY CAR MOTION THROUGH RAILROADS YARD (VERSIONS) | 2006 |
|
RU2430845C2 |
WORKING TRANSPORTATION UNIT SYSTEM FOR FREIGHT TRANSPORTATIONS | 2015 |
|
RU2608146C2 |
Authors
Dates
2009-02-20—Published
2007-04-26—Filed