FIELD: construction industry.
SUBSTANCE: pile foundation erection method involves formation of supporting members of piles and subsequent attachment thereof to piles. First, two or more underground tunnels are developed to the area of foundation structure; then, supporting members of piles are formed by filling the bottom of underground tunnel sections within foundation structure area with concrete. Before supporting members are attached to piles, the former shall be anchored.
EFFECT: improving bearing capacity of pile foundation.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
FOUNDATION | 2006 |
|
RU2320820C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
SECTIONAL REINFORCED CONCRETE BUTTRESS WALL | 1998 |
|
RU2135695C1 |
METHOD OF PRODUCING PILE BY IMPRESSION | 2015 |
|
RU2595102C1 |
METHOD FOR CONSTRUCTION OF PILE FOUNDATION | 2015 |
|
RU2581853C1 |
METHOD FOR ERECTION OF FOUNDATION, FOUNDATION AND PILE | 2008 |
|
RU2386752C2 |
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES | 1993 |
|
RU2068916C1 |
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION | 2016 |
|
RU2633619C1 |
FOUNDATION FOR HIGH-RISE BUILDINGS | 2007 |
|
RU2357046C1 |
Authors
Dates
2009-03-20—Published
2007-06-29—Filed