FIELD: technological processes.
SUBSTANCE: application: in methods and devices for determination of clogged areas in pipeline. Method consists in the fact that time of change of measured pressure and temperature values to border values is measured both during pumping of working substance from device of working substance supply and in case of its cessation. Distance to clogged area is defined from mathematic dependence. Device comprises device for working substance pumping and pressure detectors. This device also has temperature detectors and control unit, which provides for reading of pressure values and working substance temperature values, and also measurement of time of pressure and temperature variation both during pumping of working substance and in case of its cessation.
EFFECT: increased accuracy of clogged area detection in pipeline.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING VOLUME OF NON-TIGHT TANK | 2015 |
|
RU2601615C1 |
METHOD OF DETERMINING AIR-TIGHTNESS OF CHECK VALVES OF OIL PIPELINE | 2010 |
|
RU2457455C2 |
METHOD FOR DETERMINATION OF PIPELINE OBSTRUCTION PLACE | 2013 |
|
RU2518781C1 |
METHOD FOR DETECTION OF UNTIGHT POINT IN PIPELINE SYSTEM | 2006 |
|
RU2371630C2 |
METHOD OF DETERMINING OIL WELL PRODUCTION RATE | 2007 |
|
RU2354825C2 |
METHOD FOR DETECTION OF WATER PHASE VOLUME IN FIELD GAS LINE | 2007 |
|
RU2369802C2 |
METHOD FOR DETERMINING EMISSIONS MODE | 2015 |
|
RU2675965C2 |
METHOD OF TEST FOR LEAKAGE OF ISOLATION VALVES OF LINEAR PART OF MAIN OIL PIPELINE IN OPERATION | 2012 |
|
RU2499986C1 |
SCALE FOR INTERNAL ENERGY OF THERMOMETRE WORKING MEDIUM | 2008 |
|
RU2401422C2 |
METHOD FOR DETECTING DAMAGED SPOT IN TECHNOLOGICAL BORE-HOLE STRINGS | 1992 |
|
RU2094608C1 |
Authors
Dates
2009-06-10—Published
2006-09-21—Filed