CONTROL BY SEVERAL AZIMUTHS BY VERTICAL CRACKS, APPEARING AT HYDRAULIC FRACTURING IN FRIABLE OR SLIGHTLY CEMENTED SEDIMENTS Russian patent published in 2009 - IPC E21B43/26 

Abstract RU 2359115 C2

FIELD: oil and gas industry.

SUBSTANCE: invention relates to method and facility for initiation of formation by several azimuth of vertical cracks of hydraulic fracturing from one drill hole in friable or slightly cemented sedimentary rocks, which are provided for control of formation and management of distribution by several azimuth of hydraulic fracturing cracks. Essence of the invention: forcing casing pipec by several initiating sections is inserted into drill hole and saturated with cement grout. Disruptive liquid, transferring propping agent, pumping into forcing casing pipe and there are opened initiating sections, sliding layer in the direction orthogonal the first azimuth plane of crack. After finishing of pumping into the first crack disruptive liquid is again pumped into the forcing casing pipe and it is opened the group from the second and following initiating sections for layer sliding, formation initiation and diffusion of the second and following vertical cracks of frac job by azimuth, differs from azimuth of the first and following created before cracks.

EFFECT: vertical cracks, passing by several azimuth, there are provided major yield and production from the layer of liquids on the oil basis.

18 cl, 10 dwg

Similar patents RU2359115C2

Title Year Author Number
METHOD AND DEVICE FOR FISSURE CREATION IN UNCASED WELLS 2002
  • Veng Ksiaovej
  • Braun Dzh. Ehrnest
  • Boni Kertis L.
RU2318116C2
DEFLECTING FLUID 2006
  • Sinkler A. Richard
  • Akbar Sied
  • Oukell Patrik R.
RU2433157C2
METHOD OF WELL COMPLETION IN UNDERGROUND FORMATION (VERSIONS) 2005
  • Uillett Ronal'D M.
  • Surdzhaatmadzha Dzhim B.
  • Makdehniel Billi U.
  • Farabi Leldon Mark
RU2375561C2
HYDRAULIC RESERVOIR FRACTURE FORMING METHOD 2003
  • Leman Lajl V.
  • Rajt Kristofer A.
RU2267610C2
METHOD FOR FRACTURING AND PROPPING OF FISSURES IN SUBSURFACE BED 1995
  • Llojd Garner Dzhons
RU2138632C1
PROCEDURE FOR EXTRACTION OF HEAVY OIL FROM COLLECTOR THROUGH HORIZONTAL BOREHOLE AND SYSTEM OF BOREHOLES 2008
  • Shul'Ts Rodzher L.
  • Khoking Grant
  • Kavender Travis V.
RU2423605C1
METHOD FOR EFFICIENCY IMPROVEMENT IN INJECTION AND INTENSIFICATION OF OIL AND GAS PRODUCTION 2009
  • Bell Mattkhev Robert George
  • Vesson David S.
  • Klark Natkhan Garret
  • Khardesty Dzhokhn Tkhomas
RU2567877C2
METHOD OF INTENSIFICATION OF NATURAL GAS EXTRACTION FROM COAL BEDS 2006
  • Miller Mehtt'Ju
  • Barykin Aleksej Evgen'Evich
  • Braun Ehrni
RU2343275C2
METHODS OF CONTROLLING OPERATION OF PERFORATORS SYSTEM IN BOREHOLE, UNDERGROUND BED FISSURING AND PROCESSING 2009
  • Makleod Trevor
  • Makhdi Abbas
RU2467160C2
PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) 2007
  • Olsen Tom
RU2427707C2

RU 2 359 115 C2

Authors

Khoking Grant

Dates

2009-06-20Published

2004-12-28Filed