METHODS OF CONTROLLING OPERATION OF PERFORATORS SYSTEM IN BOREHOLE, UNDERGROUND BED FISSURING AND PROCESSING Russian patent published in 2012 - IPC E21B43/11 E21B47/06 

Abstract RU 2467160 C2

FIELD: oil-and gas industry.

SUBSTANCE: set of inventions relates to development of wells. Proposed system comprises set of perforators and transducers unit. Proposed method comprises the following jobs. Lowering the system in borehole on well-logging cable, locating said system nearby processing area; perforating processing zone; injecting propping agent-bearing fluid into said area; measuring, at least, one parameter in borehole with perforator system in said fluid; transmitting said parameter via well-logging cable to monitoring system and adjustments; adjusting at least one parameter in response to said transmitted measurement for increasing efficiency and optimising collector. Note here that, at least, one parameter of perforator system is selected from the set of processing fluid components, fluid pressure, fluid properties and their combination, and displacement of perforator system.

EFFECT: accurate monitoring.

17 cl, 7 dwg

Similar patents RU2467160C2

Title Year Author Number
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
METHOD FOR PERFORMING WELL OPERATIONS USING SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMPS, AND SYSTEM FOR METHOD'S IMPLEMENTATION 2008
  • Orban Zhak
  • Verkamer Klod
RU2469182C2
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING 2008
  • Doz'Er Dzhorzh K.
RU2489571C2
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
PRODUCTION SIMULATION METHOD AND SYSTEM 2012
  • Chuprakov Dmitry Arefievich
  • Prioul Romain Charles Andre
  • Weng Xiaowei
  • Kresse Olga
  • Gu Hongren
RU2567067C1
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1
DETERMINATION OF PARAMETERS OF BOTTOMHOLE FRACTURE PART OF FRACTURE WITH USE OF ELECTROMAGNETIC WELDING OF BOTTOMHOLE FRACTURE PART OF FRACTURE FILLED WITH CONDUCTIVE PROPPANT 2015
  • Homan Dean M
  • Kalinin Sergej Aleksandrovich
  • Alekseenko Olga Petrovna
  • Khoman Din M
RU2668602C1
CONTROLLING FRACTURING OPERATIONS 2019
  • Mu, Nan
  • Weng, Xiaowei
  • Lesko, Timothy Michael
  • Matthews, James
  • Kajita, Marcos Suguru
  • Mi, Bao
  • Bagulayan, Amal
  • Daube, Francois
  • Hobbs, Brandon Travis
  • Kuhn De Chizelle, Yan P.
  • Menasria, Samir
  • Ho, Kevin
RU2776140C1
METHOD FOR DETERMINING GEOMETRY OF UNDERGROUND FORMATION FRACTURE (VERSIONS), AND SIMULATION METHOD OF GEOMETRICAL PARAMETERS OF UNDERGROUND FORMATION FRACTURE 2009
  • Makdehniel Robert R.
  • Pipls Koudi R.
  • Gardner Robin P.
RU2483210C2

RU 2 467 160 C2

Authors

Makleod Trevor

Makhdi Abbas

Dates

2012-11-20Published

2009-02-27Filed