FIELD: construction.
SUBSTANCE: residential complex with infrastructure has a shape of a stadium. At the same time the building material is ice reinforced with a heat insulation waterproof coating frozen into it. For stronger connection of the frozen-in material with ice on the surface of the ice building element, for instance, a pillar, a panel, there are irregularities created in the form of grooves and ledges of higher roughness.
EFFECT: reduction of labour intensity of civil works.
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD AND CONSTRUCTION ELEMENT FOR ITS IMPLEMENTATION | 2008 |
|
RU2365714C1 |
METHOD OF BUILDING ELEMENT PRODUCTION | 2009 |
|
RU2407864C1 |
MATTRESS | 2003 |
|
RU2266698C2 |
PIPELINE TRANSPORT | 2010 |
|
RU2499707C2 |
POLYSYSTEMIC TRUSS | 2013 |
|
RU2528311C1 |
VESSEL WITH NECK | 2003 |
|
RU2263061C2 |
MULTIFUNCTIONAL STRUCTURE | 2015 |
|
RU2606718C2 |
RESIDENTIAL STRUCTURE " ECODOME " | 2001 |
|
RU2209276C2 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
MULTITIER GARAGE COMPLEX | 1997 |
|
RU2139398C1 |
Authors
Dates
2013-02-20—Published
2011-04-08—Filed