FIELD: construction of structures in the North regions. SUBSTANCE: method includes preparation of platform, installation of inflatable structures, freezing on of ice by layer spattering or pouring the water. Inflatable structures meeting the respective requirements are used in the form of structure forms, forms for air ducts and hollows for mounting of various plants in body of ice structure. These inflatable structures are subsequently dismantled and moved to other places where they are needed. Fan for inflatation of cold air is installed at the lowermost point of structure and connected with built-on vertical pipe. It allows accumulation of cold in structure body and increase of its load-carrying capacity. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ICE STRUCTURE ERECTION METHOD | 2015 |
|
RU2599522C1 |
METHOD FOR ERECTION OF ICE PLATFORM ON GROUND | 1995 |
|
RU2080440C1 |
WASTE CLEANING CONSTRUCTION | 1997 |
|
RU2132304C1 |
METHOD FOR ERECTION OF ICE STRUCTURES | 1994 |
|
RU2094570C1 |
METHOD OF ENGINEERING PROTECTION OF FPU PLATFORM FROM ICE EVENTS IN CONDITIONS OF ARCTIC SHELF | 2013 |
|
RU2532941C1 |
0 |
|
SU1778233A1 | |
ICE MOORING CONSTRUCTION METHOD IN ARCTIC CONDITIONS | 2019 |
|
RU2715034C1 |
METHOD OF ENGINEERING PROTECTION OF FLOATING PRODUCTION PLATFORM FROM ICE EFFECTS UNDER CONDITIONS OF ARCTIC SHELF | 2015 |
|
RU2604888C1 |
METHOD OF ERECTING AN ICE STRUCTURE | 0 |
|
SU1497353A1 |
TRANSPORTATION AND ENERGY SYSTEM OF RUSSIA | 2012 |
|
RU2520972C2 |
Authors
Dates
1998-10-27—Published
1997-01-16—Filed