FIELD: physics, measurements.
SUBSTANCE: invention is related to methods for determination of resilient characteristics of pile-stands and hanging driven piles of different type and enclosing soil in process of construction or reconstruction of buildings and structures. With the help of digital registration of resilient oscillations from combination of pulse mechanical actions at pile cap and calculation of averaged Fourier spectra from the field of longitudinal oscillations, at least three first frequencies of pile own longitudinal oscillations are identified. Then solving equations in pile model with free upper and resiliently fixed lower ends, using available frequencies, elastic parameters of pile and enclosing soil are defined: longitudinal rigidity of pile for compression - stretching EF, dynamic module of pile material elasticity E, rigidity of side surface to vertical shift KZ SH, rigidity of foundation soil under pile lower end KZ F. Elastic parametres are used to estimate class of pile concrete, and it is compared to the rated one. Rigidity characteristics are used to estimate values of actual bearing capacity of inspected piles by their comparison with analog characteristics for piles tested by static or dynamic loads.
EFFECT: provision of possibility to measure parametres for piles with unevenness of bearing capacity.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
FOUNDATION STRUCTURE FOR BUILDING AND BUILDING STRUCTURE | 2003 |
|
RU2256033C2 |
SCREW PILE | 2015 |
|
RU2583793C1 |
BORED PILE BEARING CAPACITY DETERMINING METHOD | 2007 |
|
RU2349711C2 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208088C2 |
QUAKEPROOF BUILDING | 2012 |
|
RU2535567C2 |
DESIGN OF HYDRODYNAMIC DAMPER OF BRIDGE SPAN VIBRATIONS | 2011 |
|
RU2475586C1 |
METHOD OF MONITORING THE TECHNICAL CONDITION OF BRIDGE STRUCTURES IN THE PROCESS OF THEIR OPERATION (VARIANTS) | 2017 |
|
RU2650812C1 |
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION | 2003 |
|
RU2244067C1 |
METHOD TO INCREASE BEARING CAPACITY OF BORED PILE | 2012 |
|
RU2509842C2 |
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
Authors
Dates
2009-08-20—Published
2008-01-09—Filed