METHOD TO INCREASE BEARING CAPACITY OF BORED PILE Russian patent published in 2014 - IPC E02D27/12 

Abstract RU 2509842 C2

FIELD: construction.

SUBSTANCE: method to increase bearing capacity of bored piles consists in the fact that each bored pile is made of two elements; the lower part - from loose working substance (crushed stone, slag and similar material) interacting with a soil base, besides, the foot of the working substance lies deeper than the depth of soil freezing, the upper part of the pile is erected as solid, reinforced concrete with a cross-shaped head. The solid reinforced concrete grill is erected, and the whole structure is partially erected. Pairs of jacks-pulsators of double reciprocal action are mounted onto cross-shaped heads, their plungers are rested against the structure grill. Pairs of jacks-pulsators are connected by oil lines with a pulsating pump station. From the panel, jacks-pulsators are switched on, and pulses are applied to press the upper solid part of the pile deep down, using the foot of the solid pile, the working substance is pressed into loose soil base, the form of the working substance contact surface is transformed with the soil base into a drop-like, pear-like shape, pressed with the surface of the contact of the working substance of the weak soil base under it and around it, previously they stress, seal and strengthen these weak loose zones of the soil base, to the rated value of force. Using the manometers, they monitor pressure developed by a pair of jacks-pulsators, the bearing capacity of each pile is increased several times. Strength and deformability of the zone of contact of the soil base with the working substance is balanced. The bearing capacity of piles is balanced in respect to each other, and uneven subsidence is prevented, and the structure list is eliminated.

EFFECT: increased bearing capacity of bored piles during construction, elimination of uneven subsidence of separate piles and the whole structure.

1 ex, 4 dwg

Similar patents RU2509842C2

Title Year Author Number
METHOD TO CONTROL DISPLACEMENT, SETTING AND HEELING OF STRUCTURE BY PILED FOUNDATIONS, BEING MACROREGULATORS 2008
  • Nezhdanov Kirill Konstantinovich
  • Nezhdanov Aleksej Kirillovich
  • Kaledin Konstantin Ivanovich
RU2416696C2
FOUNDATION FOR ECCENTRIC LOADED COLUMN 2002
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Lashtankin A.S.
RU2225480C2
CONTROL METHOD FOR SETTLED FOUNDATION SETTLEMENT 2002
  • Nezhdanov K.K.
  • Nezhdanov A.K.
  • Kostrykin P.A.
  • Tumanov A.V.
RU2230157C2
METHOD FOR SIMULTANEOUS TWO REINFORCED CONCRETE SCREW PILE FEET DRIVING IN GROUND 2005
  • Nezhdanov Kirill Konstantinovich
  • Tumanov Vjacheslav Aleksandrovich
  • Kuz'Mishkin Aleksej Aleksandrovich
  • Nezhdanov Aleksej Kirillovich
RU2295004C2
METHOD FOR CONNECTION OF ECCENTRICALLY LOADED COLUMN WITH STEPPED FOUNDATION 2003
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
RU2244783C1
DREDGE PUMP 2002
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Kuz'Mishkin A.A.
RU2228408C2
METHOD OF INDUSTRIAL BUILDING FOUNDATION CONSTRUCTION 2003
  • Stepanov A.Ju.
  • Anurov Ju.M.
  • Kirillov G.A.
RU2244067C1
FOUNDATION 2006
  • Shadunts Konstantin Shagenovich
  • Marinichev Maksim Borisovich
  • Demchenko Vladimir Anatol'Evich
RU2320820C1
PORTAL CRANE STRUCTURE 2002
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Lashtankin A.S.
RU2235673C2
METHOD FOR PLATE-PILE FOUNDATION CONSTRUCTION 2016
  • Pronozin Yakov Aleksandrovich
  • Stepanov Maksim Andreevich
  • Volosyuk Denis Viktorovich
  • Abbasov Polad Shakhlar Ogly
RU2616633C1

RU 2 509 842 C2

Authors

Nezhdanov Kirill Konstantinovich

Tumanov Vjacheslav Aleksandrovich

Tumanov Anton Vjacheslavovich

Dates

2014-03-20Published

2012-04-24Filed