POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND Russian patent published in 2008 - IPC E02D27/35 

Abstract RU 2317375 C2

FIELD: construction and operation of railroad overhead system to be erected in adverse subgrade conditions, namely in permafrost conditions and deep seasonal heaving ground freezing.

SUBSTANCE: method involves forming bored pile having lower widened part in ground in area of pole erection; connecting pile with overhead system pole at height of 0.6-0.8 m over ground surface with the use of platform horizontal welded joint through embedded members built in pile head and pole. Well-known discharge impulse technology is used for pile erection. Said discharge impulse technology provides pile anchoring in permafrost ground and increases pile resistant to ground heaving forces. Widened pile part provides decreased length of pile anchoring in permafrost ground.

EFFECT: increased conical reinforced concrete pole stability, decreased labor inputs and reduced pre-stressed reinforcement due to decreased length of pile anchoring in permafrost ground and reduced pile section within active heaving zone, as well as decreased material consumption and labor inputs for joint creation between foundation and pole.

3 dwg

Similar patents RU2317375C2

Title Year Author Number
CATENARY LINE SUPPORT ON SLOPE AND DECLIVITY ERECTED ON HEAVING SOILS 2018
  • Abzhalimov Rais Shakirovich
RU2697755C1
WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS 2023
  • Alyavdin Dmitrij Vyacheslavovich
  • Alyavdin Dmitrij Dmitrievich
  • Unzhakov Andrej Sergeevich
  • Efimov Vasilij Moiseevich
  • Bolshev Konstantin Nikolaevich
RU2822185C1
FOUNDATION ON HEAVING SOILS 2014
  • Nevzorov Aleksandr Leonidovich
  • Churkin Sergej Vladimirovich
RU2550169C1
PILE FOUNDATION BUILT ON HEAVING FOUNDATION SOIL 2004
  • Abzhalimov R.Sh.
RU2260094C1
METHOD FOR SECURING METAL PILES IN CONDITIONS OF PERMAFROST 2021
  • Stupitskij Valerij Petrovich
  • Astrakhantsev Leonid Alekseevich
  • Tikhomirov Vladimir Aleksandrovich
  • Lobanov Oleg Viktorovich
RU2773488C1
BRIDGE ABUTMENT 2022
  • Pinchuk Petr Stepanovich
  • Shcherbakov Vladimir Vasilevich
  • Komyagin Sergej Anatolevich
  • Pashtykov Artem Vitalevich
RU2808016C1
HEATED LOW-RISE BUILDING WITH FLOOR BY WARMED PEDIMENTAL CEILING SCAFFOLDING ON HEAVING GROUND BASE 2006
  • Abzhalimov Rais Shakirovich
RU2337211C2
COMBINED METHOD OF ARRANGEMENT OF PILE FOUNDATIONS IN PERMAFROST SOILS 2019
  • Mestnikov Vladimir Vladimirovich
  • Mestnikova Iya Vladimirovna
  • Mestnikov Vladimir Vladimirovich
RU2712976C1
METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL 2022
  • Shammazov Ildar Airatovich
  • Sidorkin Dmitrii Ivanovich
  • Batyrov Artur Magomedovich
RU2785329C1
RAILWAY RAIL TRACK 2017
  • Gornostaev Albert Vasilevich
  • Lanchkin Sergej Viktorovich
RU2700098C2

RU 2 317 375 C2

Authors

Abzhalimov Rais Shakirovich

Dates

2008-02-20Published

2006-01-25Filed