SYSTEM AND METHOD OF SURVEY IN PROCESS OF DRILLING Russian patent published in 2009 - IPC E21B47/12 G01V1/40 

Abstract RU 2365751 C2

FIELD: oil and gas production.

SUBSTANCE: invention is related to survey of wells in process of drilling and is intended for detection of annular pressure in process of drilling. System is installed in drilling tool suspended on boring tower by means of drill column. System comprises at least one boring collar, device for survey in process of drilling and at least one external detector. Boring collar has lateral walls in process of pipe that create channel for flowing of drilling mud through it. Device for survey in process of drilling is installed in channel of at least one drilling collar and may be selectively extracted from it. External detector is located in side wall of drill collar and is insulated from channel. Besides, external detector is opened into well to make measurements and is equipped by wireless communication with device for survey in process of drilling.

EFFECT: improved reliability of measurements due to provision of possibility to continuously measure well parametres in process of drilling on a real time basis under conditions of high temperatures and pressures.

35 cl, 8 dwg

Similar patents RU2365751C2

Title Year Author Number
SYSTEM AND METHOD OF MEASUREMENTS DURING DRILLING 2016
  • Vlad Rozenblit
  • Vadim Buryakovsky
  • Michael Lev
RU2733874C2
WELL COMMUNICATION SYSTEM AND METHOD 2006
  • Ehsteves Karlos E.
  • Rid Kristofer P.
  • Jutehn Remi
RU2439318C2
COATING WITH ULTRA-LOW FRICTION FOR ASSEMBLED DRILLING STRINGS 2009
  • Bangaru Narasimkha-Rao Venkata
  • Ozektsin Adnan
  • Dzhin Kh'Junvoo
  • Bidiger Ehrika A. Ooten
  • Behjli Dzheffri R.
  • Gupta Vishvas
  • Ehrtas Mekhmet Deniz
  • Ehlks Uill'Jam K.
RU2509865C2
BOREHOLE MEASUREMENTS TO BE TAKEN DURING WELL OPERATIONS OTHER THAN DRILLING 2004
  • Sonn'Er Dzhejms A.
  • Kolbert Robbi B.
  • Anderson Dzhejms U.
  • Khajzig Geral'D
  • Pitstsolato Blejk S.
  • Khiks Dzhonni S.
RU2310748C2
EVALUATION OF PARAMETRES OF PRODUCTIVE FORMATION DURING DRILLING PROCESS 2006
  • Vil'Jareal' Stiven Dzh.
  • Tsiglenek Rajnkhart
  • Staker Majkl Dzh.
  • Duong Kkhankh
RU2416720C2
SYSTEM AND PROCEDURE (VERSIONS) FOR ESTIMATION OF PARAMETRES OF UNDERGROUND RESERVOIR 2006
  • Louvell Dzhon R.
  • Bogat Kristofer S.
  • Pringnitts Stiven Dzh.
RU2419721C2
METHOD FOR USING PAUSES IN BORING PROCESS FOR PERFORMING MEASUREMENTS OF GEOLOGICAL LAYER CHARACTERISTICS, DEVICE FOR PERFORMING MEASURINGS OF GEOLOGICAL LAYER CHARACTERISTICS, METHOD FOR CHANGING ORDER OF DATA COLLECTION 1999
  • Krehri Stiven F.
  • Khajdler Ral'F
  • Pojtzh Martin E.
  • Esmersoj Kengiz
RU2229023C2
CABLE SERVICE CHANNEL AND SYSTEM OF TELEMETRY FOR DRILLING STREAM, AND METHOD OF WELLS DRILLING (VERSIONS) 2004
  • Bojl Brjus V.
  • Pako Nikolja
  • Ash Zhan-Mishel'
  • Juten Remi
  • Madkhavan Ragkhu
  • Zhjund Zhak
RU2384702C2
SYSTEM AND METHOD FOR AUTOMATIC CALIBRATION OF LOAD AT DRILL BIT TRANSDUCER AND CONTROL OVER DRILL STRING FLEXURE 2012
  • Khehj Richard T.
  • Sehmjuehl' Robello
RU2567575C1
MULTIPOLAR SOURCE 2004
  • Mijamoto Kenitiro
  • Saito Atsusi
RU2358292C2

RU 2 365 751 C2

Authors

Majes Dzhejms S.

Dates

2009-08-27Published

2004-07-23Filed