BOTTOM HOLE ARRANGEMENT OF WELL Russian patent published in 2009 - IPC E21B43/11 

Abstract RU 2369727 C1

FIELD: oil and gas production.

SUBSTANCE: invention refers to well development and operation of multi-bed deposits of hydrocarbons, particularly to process and engineering of simultaneous-separate operation of several objects with one well; it can be implemented for pull-out of hole, for example for perforating, acid treatment, and hydraulic breaking of reservoir (HBR) operated with one well. Bottom hole arrangement of well for perforating of reservoirs of a multi-bed deposit consists of perforators, connected to a flow string and equipped with seats for a valve for alternate actuation of perforators; the seats are located on side surface of a single tube body. A blind plug with a fishing head is installed in the seat of the tube body in its lower part; also each of perforators is equipped with a valve turning a body with a slide valve on. Slides of valves are connected with a common rod by means of drivers; the common rod consists of separate sections of adjusted length facilitating alternate opening of channels of perforator valves. Dimensions of seats for slides of valves differ and increase in the direction from a lower valve to an upper one. The rod is equipped with an indexing mechanism ensuring its arrangement corresponding either to opening of one of the valves of the perforator or to closing all of them, or to setting rod into the lowest position, or to the position of extracting. In its low part the rod is equipped with a grip designed to interact with the fishing head of the plug. In upper part of the rod there is the fishing rod which facilitates reciprocal motion of the rod by means of a down hole tool. Internal surfaces of bodies of the valves are equipped with grooves for fixation of inter well equipment installed in openings of bodies.

EFFECT: upgraded efficiency of reservoir effecting operations, reduced time of operations.

1 dwg

Similar patents RU2369727C1

Title Year Author Number
DOWNHOLE MULTI-PACKER PLANT FOR WELL COMPLETION DURING STACKED POOL DEVELOPMENT 2006
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
  • Muftakhov Marat Gafurovich
RU2300624C1
METHOD HYDRAULIC RESERVOIR FACTORING EXECUTION WITHOUT LIFTING DOWNHOLE ASSEMBLY 2008
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
RU2374437C1
HYDRO-MECHANIC PACKER 2008
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
RU2370628C1
DEVICE FOR COMBINED AND SEPARATE OPERATION AND MAINTENANCE OF FORMATION PRESSURE IN TWO PRODUCTIVE FORMATIONS IN OFF-LINE MODE 2011
  • Ovsjankin Andrej Mikhajlovich
RU2478772C2
METHOD FOR MULTI-STAGE HYDRAULIC FRACTURING IN WELL WITH HORIZONTAL TERMINATION 2019
  • Shamsutdinov Nikolaj Maratovich
  • Bityukov Vladimir Valerevich
  • Sergeev Sergej Yurevich
  • Grigorev Andrej Petrovich
  • Leontev Dmitrij Sergeevich
  • Ovchinnikov Vasilij Pavlovich
RU2732891C1
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION 2016
  • Nemkov Aleksej Vladimirovich
  • Kustyshev Aleksandr Vasilevich
  • Krasovskij Aleksandr Viktorovich
  • Syrchin Andrej Andreevich
  • Antonov Maksim Dmitrievich
  • Kanashov Vladimir Petrovich
RU2614998C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2562641C2
BYPASS SYSTEM OF PUMPING UNIT 2017
  • Panachev Mikhail Vasilevich
  • Orlov Andrej Yurevich
  • Kozlov Evgenij Vladimirovich
  • Bondar Aleksej Fedorovich
RU2654301C1
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2495235C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF WELL WITH HYDROFRACTURING 2016
  • Strakhov Dmitrij Vitalevich
  • Ibatullin Rinat Rasimovich
RU2620818C1

RU 2 369 727 C1

Authors

Ovsjankin Andrej Mikhajlovich

Kilin Mikhail Ivanovich

Dates

2009-10-10Published

2008-06-07Filed