DEVICE FOR COMBINED AND SEPARATE OPERATION AND MAINTENANCE OF FORMATION PRESSURE IN TWO PRODUCTIVE FORMATIONS IN OFF-LINE MODE Russian patent published in 2013 - IPC E21B43/00 

Abstract RU 2478772 C2

FIELD: oil and gas industry.

SUBSTANCE: device consists of a production string, on the string head of which there installed are injection valves including a head valve with a sealer installed on it, a tee-piece with a side tap for supply of injection fluid to upper formation by means of tubing string. A packer is installed on the tubing to isolate lower formation from upper formation. In order to supply injection fluid to lower formation and perform underground repair, the device is equipped with a string of flexible pipes, which passes through the sealer, which are located inside the tubing string, and with an additional packer that together with the first packet isolates the well space related to upper formation. The tubing string is equipped in its lower part with the sealer of flexible pipe string and equipped with a branch pipe with a fastener that retains it. The lower part of the branch pipe is equipped with a check valve, and upper part is equipped with a controlled check valve and a disconnector, the lower part of which is connected to the branch pipe and the upper one is connected to flexible pipe string. A circulation valve is installed on the tubing string between packers.

EFFECT: maintenance of formation pressure.

1 dwg

Similar patents RU2478772C2

Title Year Author Number
DOWNHOLE MULTI-PACKER PLANT FOR WELL COMPLETION DURING STACKED POOL DEVELOPMENT 2006
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
  • Muftakhov Marat Gafurovich
RU2300624C1
HYDRO-MECHANIC PACKER 2008
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
RU2370628C1
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH HYDRAULIC MONITOR AT PRESSURE DRAWDOWN 2016
  • Popov Pavel Ivanovich
RU2632836C1
METHOD AND DEVICE FOR INITIATING INFLOW FROM STRATUM 1993
  • Petrov Nikolaj Aleksandrovich
  • Malikov Roman Tagirovich
RU2065948C1
BOTTOM HOLE ARRANGEMENT OF WELL 2008
  • Ovsjankin Andrej Mikhajlovich
  • Kilin Mikhail Ivanovich
RU2369727C1
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION 2016
  • Nemkov Aleksej Vladimirovich
  • Kustyshev Aleksandr Vasilevich
  • Krasovskij Aleksandr Viktorovich
  • Syrchin Andrej Andreevich
  • Antonov Maksim Dmitrievich
  • Kanashov Vladimir Petrovich
RU2614998C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Pasynkov Andrej Geroevich
  • Aleksandrov Vadim Mikhajlovich
  • Ponomarev Andrej Aleksandrovich
  • Kleshchenko Ivan Ivanovich
  • Ovchinnikov Vasilij Pavlovich
RU2669950C1
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2495235C1
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP 2015
  • Ibragimov Nail Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Dzhafarov Mirzakhan Atakishi Ogly
  • Matveev Dmitrij Valerevich
  • Khazipov Farid Raisovich
RU2589016C1

RU 2 478 772 C2

Authors

Ovsjankin Andrej Mikhajlovich

Dates

2013-04-10Published

2011-03-11Filed